Do I need a party wall notice for roof work?

Roof work mostly stays on your own side of the boundary. Cutting into a wall shared with next door is different, and the Party Wall etc. Act 1996 says when the neighbour must be told.

Get a written quote

Call 01582 935272WhatsApp us

Roof lantern on a single-storey brick kitchen extension
PicturedRoof lantern on a single-storey brick kitchen extension.

The short answer

Yes, if the work cuts into a shared wall, such as cutting away a chimney breast, or adds a wall on the boundary or digs close to the neighbour's building. The building owner serves the notice: allow at least two months ahead for the party structure and at least one month for a boundary wall or excavation.

A roof drawing with its parts named: ridge tiles, tiles, battens, underlay, raftersRidge tilesTilesBattensUnderlayRafters

Who serves the notice, and when

The Party Wall etc. Act 1996 sets the duty on the building owner, the person paying for the work rather than the roofer. A notice goes to each adjoining owner in writing before work begins. Neither a builder nor a surveyor serves it by default, and a roofer's job does not stretch to doing it for you.

The lead time depends on the work. Under section 3, notice of work to a party structure has to "be served at least two months before the date on which the proposed work will begin". Under section 1(2), a wall newly built on the line of the boundary, or beside it, needs notice "at least one month before he intends the building work to start". Digging close to the neighbour's building has its own notice, again with a one-month minimum.

A notice that gives the right date and describes the work in plain terms is easier for a neighbour to answer. The Act sets timings and a way of settling a dispute, and it does not call for a roofer's quote to be attached. If you are unsure what to write, a party wall surveyor can advise on the wording.

Building control does not deal with party walls, and a party wall surveyor can advise on them. The two run side by side, because the building regulations look at the structure and the Act looks at the neighbour. Our building regulations guide covers the first.

Roof jobs that may trigger it

Section 2(2)(g) names cutting away from a party wall "any projecting chimney breast, jamb or flue". That is why removing the breast of a chimney on a shared wall is the roof-adjacent job that brings the Act in. Cutting a flashing into a shared wall may count too, so ask a party wall surveyor if the work goes that far.

Work and the notice period
WorkNotice
Cutting away a chimney breastAt least 2 months
New boundary wallAt least 1 month
Excavation beside a neighbourAt least 1 month

A repair that stays inside your own roof slope, clear of any shared wall, does not bring the Act into play in the way a chimney breast does. The position depends on the house, though, so a short check is better than an assumption. Terraced and semi-detached homes share walls, and the line of a roof does not always follow the line of the boundary.

Building Regulations approval is a separate requirement for a chimney breast coming out, whichever wall carries it, so a shared stack brings both sets of rules into play and both need planning for.

What the neighbour can do

After notice has been served, the neighbour has 14 days to reply. Under section 5, an owner who gives no consent in that period is "deemed to have dissented from the notice". GOV.UK puts it plainly: "You cannot assume that no response means they agree to the works." The 14 days are a reply period, not the lead time, which stays at one or two months.

Dissent is not a veto. It leads to the procedure in section 10, where a dispute is settled by an agreed surveyor or by a surveyor for each side. GOV.UK says you must appoint a surveyor if you and your neighbour cannot agree. Written consent is the quicker route, and works may proceed "with the consent in writing of the adjoining owners and of the adjoining occupiers".

Plan your dates around that. A job that needs two months' notice cannot start on the day a quote is accepted, so the scaffold booking and the roofing dates may have to move. Our roofing costs explainer shows how a written total is reached, and the Daylight Roofing home page lists the work we carry out.

Party wall notices and roof work, answered

01Who has to serve a party wall notice?

The building owner, who is the householder commissioning the job. The notice is served on each adjoining owner in writing, ahead of the start date. A roofer does not serve it as part of the roofing job, and the Act does not hand the duty to a surveyor, although a party wall surveyor can advise on what a notice should say.

02How long before the start must notice go out?

Cutting into a party structure, a chimney breast for example, calls for two months: the Act asks for service of the notice a minimum of two months before the date work begins. A wall on the boundary, or digging nearby, calls for one month. Written consent from the neighbours can allow an earlier start than either period, and it is worth asking for.

03What if the neighbour ignores the notice?

Silence is treated as dissent. When 14 days pass with no consent, the neighbour counts as having dissented under the Act, and GOV.UK adds a warning that no response does not mean agreement. A surveyor then has to be appointed under the Act, so the job moves to the surveyor procedure rather than stopping altogether, and the start date moves with it, so build some slack into the plan.

04Does building control deal with party walls?

No. Building control looks at the Building Regulations, and questions about the Act go to a party wall surveyor instead. A chimney breast removal can involve both. To talk through a roof job at your home, call 01582 935272 or message on WhatsApp on 07880 284133, and send a photograph of the chimney and the roof around it, so the position is clear.