Is there VAT on roof and loft insulation?

Insulating a roof or loft in a home currently carries a zero VAT rate, but only for a limited period. The dates count, as does the rate that follows them and the work the rule leaves out altogether.

Get a written quote

Call 01582 935272WhatsApp us

Inside a conservatory with an insulated plastered ceiling and a roof window
PicturedInside a conservatory with an insulated plastered ceiling and a roof window.

The short answer

Insulation fitted in the roof or loft of a home is zero-rated for VAT when the installation is made between 1 May 2023 and 31 March 2027, under HMRC's Notice 708/6. After that the reduced rate of 5% applies. Repairs and new roof coverings are a separate matter, since Notice 708/6 concerns energy-saving materials.

A roof drawing with its parts named: daylight, damp stain, purlin, loft hatchDaylightDamp stainPurlinLoft hatch

What HMRC Notice 708/6 says about roof insulation

HMRC's Notice 708/6 deals with VAT on energy-saving materials and heating equipment. Its list of energy-saving materials includes insulation for roofs or lofts. For a qualifying installation made between 1 May 2023 and 31 March 2027, the rate is zero.

From 1 April 2027 the notice moves the same installations to the reduced rate of VAT of 5%. The date that matters is the date of the supply, not the date of the quote, so a job priced now but carried out after the zero-rate period ends falls on the 5% side. If your project spans the changeover, ask the firm in writing which rate it expects to apply.

VAT rate for roof or loft insulation installations
Installation madeRate
1 May 2023 to 31 March 2027Zero
After 31 March 2027Reduced rate, 5%

The notice is written for installers who supply and fit the materials. Whether your own project qualifies depends on what is being fitted and in what setting, which is a point to settle with HMRC or the firm before you sign. For the wider picture on what drives a roofing price, from access to the covering chosen, see roofing costs explained.

What the notice does not decide

Notice 708/6 gives a VAT rate for installing energy-saving materials. Roof repairs and new roof coverings are outside what it addresses, so a job that mixes insulation with other roof work needs the firm to explain, in writing, how VAT is treated for each part. Notice 708/6 does not turn a whole quotation zero-rated because one part qualifies.

The point bites when insulation goes in as part of a bigger job. Approved Document L counts a fresh waterproof membrane on a flat roof as renovation. Past 50% of the roof surface, it asks for the improved U-value in Table 4.3 wherever that is feasible. Insulation can therefore arrive inside a roof replacement rather than as a stand-alone job. The Building Regulations guide for roof work explains how that rule works.

Spray foam is a separate matter. Lender and surveyor questions sit outside this VAT rule, and anyone with foam already in the roof space should read the government's spray foam guidance before deciding anything. Removing foam, adding foam and laying boards or rolls between joists are three different jobs, so ask how the rule applies to each before work starts.

Questions to settle before you agree a price

Because the zero rate in Notice 708/6 ends on 31 March 2027, the date of the work is worth pinning down early. Ask for the start date and the expected finish date in writing, and ask which VAT treatment the firm expects for any insulation line in its documents. A booking made now for work that slips into spring 2027 changes the position, so settle the question before the deposit is paid rather than after the invoice arrives.

  • Which rate does the firm expect to apply to the insulation, and on what basis?
  • Does the quote cover insulation only, or also repair work or a new covering?
  • What date will the installation be made, as opposed to the date of the quote?
  • If the date slips beyond 31 March 2027, who confirms the new rate, and when?

Daylight Roofing gives a written total price after a survey, and the home page explains how a roof is looked over before any figure is named. Grants are a different route again: the page on grants for a new roof covers what exists and what does not, so read it before assuming an insulation job brings funding.

Insulation and VAT, answered

01Does the zero rate on loft insulation end on 31 March 2027?

Under HMRC's Notice 708/6, energy-saving materials such as insulation in roofs or lofts carry a zero rate for installations made between 1 May 2023 and 31 March 2027. After 31 March 2027 the reduced rate of VAT of 5% applies. The relevant date is when the installation is made, so a booking in the zero-rate period for work completed afterwards needs the rate confirmed in writing.

02Is a new roof covering zero-rated because it comes with insulation?

Notice 708/6 concerns the installation of energy-saving materials such as roof or loft insulation. A new roof covering and roof repairs are not what it addresses, so a project with both parts needs the firm to say how each is treated. Ask for that in writing, and if the answer is unclear, HMRC's own guidance is the authority to check.

03Does Notice 708/6 apply to a rented flat or a business roof?

Notice 708/6 deals with energy-saving materials installed in homes, and the detail of who qualifies sits in the notice itself. A business premises, a landlord's block or a mixed-use building raises different questions, so do not assume the zero rate in Notice 708/6 carries over. Read the notice on GOV.UK, or ask HMRC, before relying on it for anything other than an ordinary home.

04Will insulation fitted in a roof replacement need Building Regulations approval?

Replacing the whole covering takes a job past the Planning Portal's 50 per cent roof limit, so approval applies, and Approved Document L expects a renovated roof to be upgraded where feasible. So insulation can form part of a job that already needs approval. The council's building control team or a registered building control approver deals with the application. Ask the firm which route it uses before the job starts, so the paperwork is in place.