What do the CDM Regulations mean for a homeowner?

Anyone paying for roof work counts as a client under CDM 2015, short for the Construction (Design and Management) Regulations. For a householder the duties shift to the roofing firm, and the paperwork is modest.

Get a written quote

Call 01582 935272WhatsApp us

Wind-torn membrane peeled back from a wet flat garage roof
PicturedWind-torn membrane peeled back from a wet flat garage roof.

The short answer

CDM 2015 makes a householder paying for roof work a domestic client, and the legal duties of that role move to the roofing firm, or to a principal contractor if several firms share the project. Every project has a construction phase plan. The householder's part is to hire a firm that accepts those duties and to ask to read the plan.

A roof drawing with its parts named: ridge tiles, tiles, battens, underlay, raftersRidge tilesTilesBattensUnderlayRafters

Who counts as a domestic client

Under the HSE's wording, a domestic client is someone who pays for building work at their house, or at a relative's house, outside any business activity. A householder who books a roofer to strip and re-cover the roof fits that description. A landlord letting the property, or a company that owns the building, does not.

A client under CDM 2015 carries duties on every kind of project, such as appointing suitable people, allowing enough time and making sure site arrangements are in place. For a domestic client, regulation 7 hands those duties across instead of leaving them with the householder. Regulation 7(1) names "the contractor for a project where there is only one contractor" and, for a job split between firms, "the principal contractor for a project where there is more than one contractor".

A principal designer can take the duties on instead, but only where there is a written agreement saying so. At quote stage the question is simple: is one firm doing the whole job, or are several firms on site under separate contracts with you? Ask it plainly, write down the reply, and file it with your copy of the quotation.

The construction phase plan and the roofer

Each project needs a construction phase plan. Where one contractor is working, regulation 15 makes that contractor responsible for drawing it up. Where a principal contractor has been appointed, regulation 12 describes that role and the plan sits with it. A plan for an ordinary house roof can be short, because it exists to show how the work will be organised safely, not to fill a folder.

Work at height is the main hazard in roofing, so the plan is where access, edge protection and the arrangements for people below get thought through. Neighbours, children, pets and anyone passing the property come into that thinking. It can also cover practical points such as where materials are stored, how the old covering leaves the site and where the skip stands.

CDM roles on a home roof job
SituationWho carries the client duties
One contractorThat contractor
Two or more contractorsThe principal contractor
Written agreement naming a principal designerThe principal designer

Reading the table against your own job takes a minute. If the roof, a chimney rebuild and some electrical work are booked with different firms, the middle row is the one that applies, so find out who the principal contractor is before anyone starts. Mention the answer to your neighbours too, so they know whom to approach if something worries them while the scaffold is up.

What a householder should ask for

Because the duties move to the contractor, your task is to make sure the contractor knows it and acts on it. Put the questions in writing when you compare quotes, and keep the replies alongside your other paperwork for the job.

  • Who is the contractor for this project, and is anyone else working under a separate agreement with me?
  • Is there a construction phase plan, and can I read it before work begins?
  • How will people be kept safe from work at height, neighbours and visitors included?
  • How will scaffolding, material storage and waste be arranged?

A firm used to domestic work answers these without fuss. If you are still choosing, read how to choose a roofer and the Daylight Roofing home page, where the survey comes ahead of any price. Poles standing on the footway or carriageway call for a licence from the highway authority; we arrange the licence with our scaffolder. Ask any firm you are weighing up who handles that step, and note the reply with the date, because a clear answer now saves a dispute later.

CDM duties, answered

01Must a homeowner draw up the safety paperwork for a roof job?

No. The construction phase plan belongs to the contractor when there is only one, and to the principal contractor when the job is split between firms. A householder's role is to hire a firm that takes the duties on and to learn who the principal contractor is when more than one firm is on site. Ask to read the plan before the work starts, and keep a copy beside your quote.

02Does CDM 2015 still apply if my roofer works alone?

Yes. CDM 2015 covers construction work on a home however small the team. Where there is only one contractor, that contractor carries the domestic client's duties and draws up the construction phase plan. A one-person firm and a large crew face the same duties; the plan simply reflects the size and risk of the job, so a sole worker's plan may be brief but should still exist.

03Who is the principal contractor if a scaffolder and a roofer both work on my house?

Where separate contractors work on the same project, one has to be the principal contractor, and the domestic client's duties settle on that firm. Who takes the role is a matter for the contractors and the contracts. As the householder, ask for the name of the principal contractor in writing before the work starts, so you know whom to speak to about safety on site.

04Can anyone other than the contractor carry my client duties?

A principal designer can, but only where there is a written agreement, so a casual understanding does not count. If anyone suggests a different arrangement, ask for it in writing and read it before agreeing. The HSE publishes guidance for domestic clients on its website, which sets out the same split of duties, and it is worth a read before you sign any contract for building work.