The short answer
NHBC describes Buildmark as "a builder warranty and NHBC guarantee for two years after completion and then eight years of insurance cover against defects to certain parts of the home". Whether a given roof fault is included depends on the policy terms, so read your documents before arranging any roof repair yourself.
Two years, then eight: how the stages work
NHBC puts it in these words: "a builder warranty and NHBC guarantee for two years after completion and then eight years of insurance cover against defects to certain parts of the home". The first stage therefore combines the builder's own promise with the scheme's own cover. The second stage is insurance, and it reaches only particular parts of the home, not the whole building.
That wording is the reason a simple yes or no is not available. The roof is part of every house, but the insurance reaches only specific parts, and the policy terms decide which roof problems fall inside it. A slipped tile after a storm, a leak from poor flashing, and wear on a covering that has aged are three different situations, and the cover may treat them differently. Your policy documents set out the detail.
| Stage | What the scheme describes |
|---|---|
| Years 1 and 2 | Builder warranty alongside the scheme's own cover |
| Years 3 to 10 | Eight years of insurance cover against defects to certain parts |
People sometimes describe this as a ten-year builder promise. It is not that: the builder's side runs for the first two years, and what follows is insurance provided under the scheme's terms, which is a different thing in kind.
What to do when a new roof develops a fault
Find your policy documents first. They state what the cover includes, what it excludes, and whom to contact at each stage. Keep them with the deeds or the completion papers, because a buyer or a lender may ask for them later. If they have gone missing, the builder or the scheme's administrator can be asked for copies.
Photograph the fault before anything changes. Take pictures of the outside of the roof from the ground, of any stain or drip inside, and of anything that has fallen. Note the date you first saw the problem and what the weather was doing. A written note with dates is useful both for a claim under the cover and for any roofer who is asked for an opinion.
Contact the party the documents name before you call a roofer to carry out repairs. Arranging your own repair on a part that may be covered could affect how a claim is handled, so check the terms and ask the builder or the scheme first. If the situation is urgent, such as water entering the house, make the area safe, take photographs and then make contact straight away rather than waiting.
A roofer can give an independent view of what has gone wrong, and the guide to choosing a roofer covers how to ask for one in writing. Ask the roofer to describe what they see and not to start any repair until the position under the cover is clear.
Roof work after the cover has ended
Once the cover ends, a roof is an ordinary roof, and repairs are a matter between you and whichever firm you hire. A new-build roof still benefits from regular looks: a view from the pavement and a glance in the loft after rain will show stains, slipped tiles or lifted flashing early. The roof maintenance checklist lists what to look at.
A roofer working on a house that is still inside its cover period should be told about it. Mention it when you request a quote, and mention any fault that has already been reported. The firm can then see what is already on record before a survey begins, and you can agree in writing how the work relates to the cover.
Daylight Roofing surveys a roof before giving one written price, and the home page explains what that survey looks at. For repairs that fall outside the cover, the page on roofing costs explained sets out what moves a price. Building Regulations approval is a separate question for any big change to a roof, and the council's building control team or a registered building control approver deals with it.

