01 A heavier covering and the structure
A different roof covering can alter the load the timbers beneath carry. The Planning Portal's trigger is a new covering material "which increases the weight of the roof covering by 15 per cent or more", and it recommends a structural engineer or surveyor beforehand. Approved Document A puts the same idea as roof loading "increased by more than 15%". Whether a particular covering crosses the line depends on what it replaces, so the comparison is made job by job.
What the survey does is look at the existing structure: the rafters, the ridge and the wall plates, for sagging lines, splits or old repairs. A roof that has dipped between its supports needs a different answer from one that is straight. The covering chosen after that is judged against the structure that has to carry it. More is under roof replacement. If the structure turns out to be sound, the choice of covering opens up; if not, strengthening comes first.

