What happens during a roof replacement

A roof replacement follows a fixed order, from the survey and the scaffold through to the flashings and the building control sign-off. Each stage has its own work, and the order of the stages has a reason.

9 minute read

Get a written quote

Call 01582 935272WhatsApp us

A stack of new clay plain tiles on a scaffold board
PicturedA stack of new clay plain tiles on a scaffold board.
A roof drawing with its parts named: ridge tiles, tiles, battens, underlay, raftersRidge tilesTilesBattensUnderlayRafters

Survey, route and the agreed total

The first visit is a survey, and no tile is lifted until it is done. What was found goes to the owner plainly, together with anything else seen up there, and a single written total follows. Covering, lining and timbers can be read properly only with the roof itself in view, so the figure cannot be set earlier.

The rules come next. The Planning Portal's test for skipping an application is that none is normally needed if "Less than 25 per cent of the total 'building envelope'" is affected and "Less than 50 per cent of the roof is affected". A whole new covering exceeds the second of those limits, so Building Regulations approval is part of the job, and the route is checked with the council before work starts.

Signing at home after the survey brings a cooling-off right. Under the Consumer Contracts Regulations, "the cancellation period ends at the end of 14 days after the day on which the contract is entered into". Work can start inside that window only if the customer has asked for it "on a durable medium", in writing, and a customer who cancels after that point may still owe something for the work done by then.

An emergency call-out sits outside the right, in the words of the regulation: "the consumer has specifically requested a visit from the trader for the purpose of carrying out urgent repairs or maintenance". Planned replacements are not in that category. That sentence is about call-outs, so a booked replacement keeps its cooling-off period.

  • the survey and the plain account of what was found
  • one written total price
  • the council route checked
  • the 14-day cancellation period

Scaffold and the licence

The working platform goes up first, and the rest of the job depends on it. Under section 169 of the Highways Act 1980, nobody may put up or keep on a highway "any scaffolding or other structure which obstructs the highway" without a licence. For Dunstable's streets the licensing body is Central Bedfordshire Council, and we arrange the licence with our scaffolder.

A scaffold gives a level platform with edge protection around the eaves, so that old and new materials can be carried up and the roof reached from every side. It also keeps the footway clear of loose material, which is why licence conditions, where a council sets them, matter to passers-by.

The regulations on construction work apply to a house as they do to a site. HSE defines a domestic client as an individual who has construction work carried out on their home, and under CDM 2015 those client duties pass to "the contractor for a project where there is only one contractor". Each project has "a construction phase plan", which sets out how the work will be run safely.

  • a licence where the scaffold stands on a road or pavement
  • a platform with edge protection at the eaves
  • a route up for new materials and down for old
  • a written plan for how the project is run

The scaffold stays until the work at height is complete, since gutters, fascias and chimney work all need it.

Stripping the old covering

With the platform in place, the old covering comes off. Tiles or slates are lifted and passed down by hand or by hoist, ridge and hip tiles go with their bedding, and the lead at chimneys and valleys is taken up so that every flashing line can be seen. The roof beneath is kept as covered as the work allows.

Stripping is the moment the roof's true state shows. The underlay, the battens and the rafters can be examined without a covering over them, and any rot, damp or damage that a survey could only suspect becomes visible. Sound timbers stay in place, and failed ones are renewed.

Two checks belong at this stage. The first is asbestos. HSE says: "If the building was built or refurbished before 2000, assume that there is asbestos in it." Asbestos cement sheeting is the kind found on garages and outbuildings, and HSE says "AC roofs are always fragile", so nobody walks on one.

The second is wildlife. The law covers anyone who "takes, damages or destroys the nest of any wild bird while that nest is in use or being built", and bats have their own protection for any "breeding site or resting place". Should either appear, work in that area halts for advice, and GOV.UK lists "repairing or replacing a roof" among the activities where a Natural England licence may be needed.

Battens and underlay

Once the roof's frame has been checked, the underlay goes down. It is rolled out over the rafters in overlapping runs from the eaves upward, and its job is to carry any water that gets through the covering down to the gutter. Timber battens are then fixed across the rafters at spacings set by the tile or slate chosen, so that the covering has something to hang from.

Ventilation is part of the specification. Marley publishes eaves figures for cold roofs fitted with high-resistance underlay: "25mm along the length of the eaves for pitches of 15° or less; 10mm along the length of the eaves for pitches of more than 15°". The underlay and the eaves detail are decided together under BS 5250, the standard for managing moisture in buildings.

Pitch decides what the covering can be. Marley publishes a minimum for each of its products, and for natural slate Cupa reports that BS 5534 "indicates" 20 degrees where exposure is moderate, and adds "hook fixings should not be used on any pitch below 25º". Choosing a covering for a new roof compares the options.

Where timbers are rotten or damaged, they are renewed during this stage, with the covering off and the repair at its simplest. New battens are fixed to sound rafters and not to wood that is soft.

Laying the new covering

Tiles or slates go on from the eaves upward, course by course, each overlapping the one below so that water runs down the face of the roof and never through the joints. Each is fixed, and how it is fixed follows the standard and the site.

Slating and tiling are covered by BS 5534:2014+A2:2018, which BSI lists as the current edition. Marley says installing to it "isn't required by law", yet the 2015 amendments made it clear that mortar "could no longer be relied upon as the only means of securing the roof covering". The fixings come from a specification written for the site, which allows for how exposed the roof is.

  • begin at the eaves with the starter course the product calls for
  • keep each course straight so the overlaps stay even
  • fix each tile as the specification directs, with clips or nails
  • cut tiles neatly at valleys, hips and abutments

Slates, tiles and each tile maker's ranges carry their own fixing rules, so one description cannot fit every roof. The product's data sheet is followed, and the pitch of the roof sets the fixing pattern. A roof that looks finished from the street can still have been fixed badly, which is why a quote that names the fixing method is worth asking for.

Ridge, hips, verges and flashings

The roof's edges are finished last, since they close the covering at every boundary. Marley's wording on ridge and hip tiles is "In all cases, ridge or hip tiles should be mechanically fixed to resist the calculated wind uplift force." BS 8612:2018 is the standard for systems that fix the ridge, hips and verges dry, without bedding mortar.

Flashings are what seal the roof against a chimney stack, a gable wall or the frame of a roof window. Calder and Ecobat make rolled lead sheet to BS EN 12588 in codes 3 to 8, and code 4 is 1.80 mm thick; the specification fixes the code used at each detail. MyJobQuote says correctly installed lead flashing "can last for over 80 years".

Valleys, where two slopes meet, take their own lining and flashing so that the heaviest run of water has a sound path to the gutter. Fascias, soffits and gutters get checked while the scaffold is still up, because a new roof that delivers water into a failing gutter only relocates the problem.

The verge, the edge at a gable end, is finished so that the covering is held down against wind and kept clear of water. Each of these edge details is something a written quote can name, and a quote that mentions none of them deserves a question.

Checks at the end of the job

The last stage looks back over the roof. Courses, ridge, verges and flashings are compared with the specification, and the gutters are looked at for flow: Brett Martin gives "1mm for every 600mm" as the fall towards the outlet. Then the scaffold is taken down.

Building control closes the file at the end, and nobody is asked to take the work on trust. Regulation 17 of the Building Regulations 2010 has the council "give a completion certificate", while a registered building control approver issues a final certificate under section 51 of the Building Act 1984. The route for either was agreed at the start, so the certificate is expected and not a surprise.

The energy rules apply to a renovated roof as well. Under AD L, where "More than 50% of the surface of the individual thermal element is renovated", the roof is brought up to Table 4.3's improved 0.16 W/m²K where feasible, against a 0.35 threshold. Where the full upgrade is not feasible, or would miss a "simple payback of 15 years or less", the work stops where that payback test stops it. AD L 2026 applies from 24 March 2027.

New roof costs and what sets the price covers the figures, and our roof replacement page covers the service as a whole.

Questions on replacing a roof

01What are the stages of a roof replacement?

A survey and a written total come first, with the council route checked, then the scaffold, licensed if it occupies the road or footway. The old covering comes off, the battens and underlay are checked or renewed, and the new covering is laid from the eaves upward. Ridge, hips, verges and flashings are finished last, and building control closes the job with a certificate.

02Who checks a finished roof?

Building control. When the work meets the Building Regulations, the council's team issues a completion certificate, whereas a registered approver issues a final certificate. The roofer builds to the specification, and building control is the independent body that signs the finished roof off for the owner. File the certificate safely, because it is the proof that the work was inspected.

03Does a new roof mean new loft insulation?

It can. On a renovated roof where more than 50% is renovated, AD L calls for the upgrade of the entire roof where feasible, to Table 4.3's improved 0.16 W/m²K, with 0.35 as the threshold. A "simple payback of 15 years or less" is the test for feasibility, so ask the council's building control team how that works out for your roof, because the answer depends on the existing insulation and on what can be fitted between and over the rafters.

04What happens if there is asbestos in the old roof?

The job changes. HSE's advice is to assume asbestos is there in any building built or refurbished before 2000. Cement roof sheets removed whole without breaking are non-licensed work, while broken-up cement is notifiable. Most work on asbestos insulating board is licensed, and HSE's guidance calls for a lockable skip, not an open one. HSE also lists "AIB white soffit panels to underside of roof eaves" among the places it turns up.

05Can the work go ahead if bats are found?

Not without advice. Damaging or destroying a bat roost is an offence whatever the intent, and GOV.UK names roof repair or replacement as work that may need a Natural England licence. Work in the affected area stops while advice is taken, and the roof is not closed over a roost in the meantime. A roofer who finds bats has stopped to ask, not to be awkward.