Do I need Building Regulations approval for a new roof?

Replacing the whole covering takes the job past the Planning Portal's 50 per cent roof limit, and passing that one limit is enough for approval to be needed. Small repairs can sit inside those limits.

Get a written quote

Call 01582 935272WhatsApp us

A loft room lit by two roof windows between the rafters
PicturedA loft room lit by two roof windows between the rafters.

The short answer

Yes, a full new roof needs Building Regulations approval, because it affects more than 50 per cent of the roof, and the Planning Portal says that in most situations re-roofing needs approval, with only small repairs able to stay inside its limits. Approval comes from the council's building control team or a registered building control approver.

A roof drawing with its parts named: ridge tiles, tiles, battens, underlay, raftersRidge tilesTilesBattensUnderlayRafters

The limits a re-roof is measured against

The Planning Portal's guide sets a pair of tests for roof work. No application is normally needed if "Less than 25 per cent of the total 'building envelope' (walls, floor, roof, windows, door, roof windows and roof-lights) is affected" and "Less than 50 per cent of the roof is affected." The first test counts the whole outer shell of the house, with the roof as one element. The second looks at the roof on its own. Work has to sit inside both, and the Portal's word normally belongs to the test.

Stripping a roof right back and laying a new covering is far outside those tests. It reaches every slope, so more than half the roof is affected, and on its re-roofing page the Portal states: "In most situations, this work will need Building Regulations approval." The same guide says you will need approval where the limits are passed, and a full new roof is the obvious case.

Two further triggers run alongside those limits, and each is quoted from the Planning Portal's guide. Approval is needed where the new material makes the covering 15 per cent or more heavier than before, or where the new covering will perform significantly differently from the old in a fire. The guide to new roof Building Regulations and Part L goes into those rules more fully.

Who grants approval

Building control is carried out by the council's building control team or by a registered building control approver, and which you use is your choice. Council building control issues a completion certificate; a registered building control approver issues a final certificate. Which certificate you get depends on the body you chose, and either one belongs among the deeds, because a solicitor acting for a future buyer can request it during a sale.

The council to contact is the one for the address of the house, and the arrangements differ from place to place. The table gives the published building control contact for four councils around Dunstable, as each council states it.

Building control contacts by council
CouncilProvided byContact
Central Bedfordshire CouncilIts own team0300 300 8635, a building control line and not for planning
Luton CouncilIts own service01582 546607
Milton Keynes City CouncilIts own team01908 252721, office hours
Bedford Borough CouncilIts own serviceCheck with its team

Councils further out, towards Hertfordshire and Buckinghamshire, run building control in their own ways, so the building control page for your council has the contact for you. Planning is a different question again, and the planning permission guide sets out how it differs, with a link in the other direction from there.

How energy rules and listed status come in

Approval brings the energy rules along with it. Under Approved Document L, a roof that is more than half renovated is to be upgraded as a whole to the Table 4.3 standard wherever that is feasible, and it names a fresh waterproofing layer on a flat roof among the works that count as renovation. The page on whether a new roof needs new insulation takes that further.

A conservatory is a related case. A new solid conservatory roof must comply with building regulations, so the sensible order is to settle the route with building control first, rather than assume it from the old glazed roof.

Before a job is booked, we check the planning or building-control route with the council, and the roof is surveyed first so that the written quote, one total, matches what is there. The roof replacement page sets out the service as a whole. A listed house adds a second layer, because work to a listed building's roof calls for listed building consent where it affects the building's character, and that consent is separate from approval under these regulations.

Approval for a new roof, answered plainly

01Does a small repair need Building Regulations approval?

A small repair can fall within the Planning Portal's tests, meaning less than 25 per cent of the building envelope and less than 50 per cent of the roof affected. A larger repair can cross them, and a covering that is 15 per cent or more heavier needs approval whatever the area. For the repair in front of you, ask the council's building control team before the work begins.

02What is the certificate at the end for?

It is the paper record that the work met the regulations. From a council the paper is a completion certificate, and from a registered approver it is a final one. Hold on to whichever you get, and store a copy somewhere safe. A roof replaced without one can raise questions at the sale stage, when a purchaser's solicitor asks what approvals exist for building work done to the house.

03Does a new roof need planning permission as well?

The two are separate. Re-roofing a house is normally permitted development under Class C, so planning permission is not usually the hurdle, while Building Regulations approval still applies to a full re-roof. An Article 4 direction or listed status can change the planning side, which is why the council is asked first. The planning guide explains where Class C starts and stops.

04Can I send a picture of the roof before booking a survey?

You can, on WhatsApp at 07880 284133, and someone will look at it. A picture cannot show how much of the roof the work reaches or what sits beneath the covering, which is what the approval question turns on. Those answers arrive after the survey, when the scope of the work is clear, and the written price follows from that.