01 Where your roof meets next door
A cottage roof that stops against a neighbour's wall relies on a flashing along that line, with small sheets of lead tucked under the tiles. Look from the garden for lead that has lifted, a gap along the mortar joint or sealant smeared over a failing joint. Inside, damp on a wall that adjoins the neighbour, or on the ceiling near it, calls for a look at that junction. A shared wall is no place for a ladder.
Work near a shared structure can bring in the Party Wall etc. Act 1996. A new wall on the line of the boundary has a one-month notice, "at least one month before he intends the building work to start". For a chimney breast cut away from a party wall the notice period is at least two months. When the neighbour does not reply within 14 days, the Act treats that as dissent, and the surveyor procedure applies instead of a veto. Questions on party walls go to a party wall surveyor, not building control. Writing down the dates of any contact with the neighbour is sensible.