Call 01582 935272

Shillington · 13 road miles north-east

Roofers in Shillington

To reach Shillington from Dunstable means 13.2 road miles to the north-east, around 26 minutes. Before a Shillington roof is priced it is surveyed, and what follows is one written total.

Get a written quote

Call 01582 935272WhatsApp us

Council
Central Bedfordshire
Road miles
13
Conservation area
Shillington
Building control
Central Bedfordshire

Shillington roofs along Church Street and beyond

Shillington is a village in Central Bedfordshire, and the run from Dunstable is 13.2 road miles to the north-east, about 26 minutes. Shillington parish had 2,077 usual residents at the 2021 Census. All Saints church is Grade I. Grade II entries include 6, 8 and 10 Church Street, Chestnut Tree Farmhouse and 14, 14a, 16 and 16a Church Street. Central Bedfordshire Council has designated Shillington and Shillington (Aspley End) as conservation areas, and a moated site north of Apsley End is a scheduled monument.

Houses built side by side have more in common than a street. Roofs meet at party walls, scaffolding on a pavement affects neighbours, and a listing can cover several addresses at once. The pitched roofing page describes re-covering a slope and the guttering, soffits and fascias page describes the roofline. For the national rules, the planning guide is the place to start.

  1. 01Church of All SaintsGrade I, list entry 1312508, first listed 23 January 1961, Church of England. The faculty system governs its roof.
  2. 02Church Street listingNos 6, 8 and 10 share Grade II list entry 1031531, first listed 1 December 1997. One entry covers the row, so a roof question touches all three.
  3. 03Chestnut Tree FarmhouseGrade II, list entry 1321745, first listed 29 July 1975. Even a like-for-like repair is put to the council before work starts.
  4. 04Moated site at Apsley EndA scheduled monument, list entry 1009586, recorded near Shillington. Works need scheduled monument consent.
A detached brick garage with a newly re-tiled pitched roof

Shillington roofing words

Party wall
A wall that stands on the boundary and belongs to, or is shared by, two owners.
Highway authority
The council department that looks after a road and licenses scaffolding on it.
First course
The lowest row of tiles or slates, laid along the eaves.
Final response
The insurer's final letter on a complaint; the Ombudsman time limit runs from its date.

The plain-as-day roof check

Four Shillington checks, from the shared wall to the insurer's file

4 checks about 3 minutes to read

  1. Roofs that share a wall
  2. Scaffolding on the pavement
  3. The first course at the eaves
  4. Photographs for an insurer

01 Roofs that share a wall

A terrace or a pair of cottages brings the Party Wall etc. Act 1996 into a roof job. Cutting into a party wall, including cutting away "any projecting chimney breast, jamb or flue", is party structure work, and the notice has to "be served at least two months before the date on which the proposed work will begin". Works can go ahead earlier "with the consent in writing of the adjoining owners and of the adjoining occupiers".

Silence does not count as agreement: GOV.UK says "You cannot assume that no response means they agree to the works." A neighbour who has not replied within 14 days is "deemed to have dissented", and then "You must appoint a surveyor if you and your neighbour cannot agree." The procedure is the Act's s10 route, not a veto. A roofer is not the person to settle any of this, which belongs to a party wall surveyor. Terraced owners can agree things between themselves in writing, which keeps the paperwork short.

02 Scaffolding on the pavement

On a village street, the poles of a scaffold may need to occupy part of the footway or the road itself. Section 169 of the Highways Act 1980 says no person shall "erect or retain on or over a highway any scaffolding or other structure which obstructs the highway" without a licence. In Shillington the highway authority is Central Bedfordshire Council, and we arrange the licence with our scaffolder.

The call to make early is how pedestrians get past. Where a footway is narrow, the layout has to leave room, and a scaffold that stands wholly on the owner's own land is a separate question that the council can answer. Fee and timing are matters for the council to state. Scaffolding sits within the one written total. A neighbour's driveway, a parked car or a bus stop nearby can each limit where the poles stand, so mention any of them when asking for a survey.

03 The first course at the eaves

The lowest row of tiles or slates takes all the water from the slope above it, and the gutter takes it from there. A tile at the eaves that has slipped, cracked or lifted lets water behind the gutter and down the wall. Look along the eaves line from the road for a tile that sits differently from its neighbours, a gutter that is not in line with the roof edge, or a dark mark on the wall below it.

Fascia timber that has gone soft or split at the end grain has been taking in water. The manufacturer Brett Martin sets the fall of a gutter at "1mm for every 600mm" towards the outlet. A run that keeps water lying along its length has therefore lost the fall it was laid to. These checks need nothing more than a pair of eyes, a phone and a note of the date, and none needs a ladder. If a sketch of the roof is drawn on paper, each fault can be marked on it with its date. A close shot of each fault, with a wide shot of where it sits, is the useful set.

04 Photographs for an insurer

If a storm damages a roof, the evidence starts with the photographs. When weighing a storm complaint, the Ombudsman will usually look at expert reports and photos. Separately, that guidance says "Rain, hail or snowfall by itself can constitute a storm". Where an exclusion is cited, "The insurer has to prove that the exclusion applies - for example, with an inspection report." Take pictures before anything is moved or covered, from the ground and, where it is safe, from a window.

Keep the files with their dates, then tell the insurer. Any complaint is made to the insurer; "For most complaints, a business has up to 8 weeks to consider a complaint." The time limit for the Ombudsman runs separately: 6 months from the date on the final response, which is the insurer's closing letter. A tarpaulin or a board over a hole is a temporary make-safe, and its receipt belongs in the same folder as the photographs and the insurer's letters.

The dashed ring takes in the nearest towns and villages we cover around Shillington. Map tiles © Esri; map data © OpenStreetMap contributors.

Shillington roof questions, from Church Street to insurer

01What should a Shillington terrace owner check when a neighbour's roof is being repaired?

Look for anything that shares a wall or a line with the neighbouring roof: a flashing along a party wall, a chimney stack serving two houses, a gutter that runs on from next door. Photograph the junction before work begins, with the date on the file, so any later change is plain. Check the junction lines with the neighbour in good light. Ask whether the work touches the party wall, because the Party Wall etc. Act 1996 may apply, and ask the neighbour to share any notice they have received. Send the photographs to us through WhatsApp if a second view would help.

02How is work to the Shillington church roof approved?

All Saints is Grade I, list entry 1312508, first listed 23 January 1961, and is a Church of England church. The faculty jurisdiction of the Church of England covers a church in use, and stands in for listed building consent. List B, the schedule that includes replacing roof lead or covering with the same material, can be satisfied by the archdeacon's written notice. If the church's outside changes, the council applies its own planning tests, which means that a faculty does not settle that part of the question.

03How are works treated at the moated site north of Apsley End?

The moated site north of Apsley End is a scheduled monument, list entry 1009586, recorded near Shillington. It is protected differently from a listed building, because listed building consent provisions "shall not apply to any building for the time being included in the schedule of monuments". Works have to be authorised beforehand. The Secretary of State decides on scheduled monument consent, and the Act makes works carried out without it an offence. Requests are lodged with Historic England, and nobody should start work on the strength of a verbal assurance from anyone. Central Bedfordshire Council can say whether a village address is touched.

04What do the Church Street listings mean for a roof repair?

Numbers 6, 8 and 10 Church Street share list entry 1031531, first listed 1 December 1997, and numbers 14, 14a, 16 and 16a share entry 1113850. Chestnut Tree Farmhouse has entry 1321745. Because one entry can cover several addresses, a repair on one house may need the same consent as its neighbours. For works "in any manner which would affect its character as a building of special architectural or historic interest", listed building consent is required, and the council takes the decision. Any message to the council should quote the entry number, since each entry names the buildings it covers.

05Which Shillington conservation area applies to a given house?

Central Bedfordshire Council has designated conservation areas called Shillington and Shillington (Aspley End). Which one an address falls in, if either, is for the council to confirm, and it is the first question for any roof alteration. A house near the boundary of an area may be inside or outside it, and only the council's records settle that. The council says permitted development rights are stricter for properties within conservation areas. An Article 4 direction can remove further permitted development rights, so we check with the council first.

06How does a party wall dispute get settled between Shillington neighbours?

Dissent does not stop the work for good. Under section 10 of the Party Wall etc. Act 1996, once a dispute "arises or is deemed to have arisen", an agreed surveyor, or one surveyor each, settles it. The duty on owners is stated on GOV.UK: "You must appoint a surveyor if you and your neighbour cannot agree." Consent given in writing by a neighbour can allow an earlier start. A party wall surveyor, not building control, deals with the dispute.

07What do the Planning Portal's re-roofing limits mean for a Shillington house?

Under the Planning Portal's interactive test, no application is normally called for while "Less than 25 per cent of the total 'building envelope'" is affected and "Less than 50 per cent of the roof is affected". A complete re-roof is beyond the second limit, which is enough on its own to need Building Regulations approval, whereas a repair to a handful of tiles stays well inside both. Central Bedfordshire Council's own building control team is on 0300 300 8635, a line for building control, not planning. Ask the team before any order is placed.

08How should a Shillington owner prepare for a roof survey?

Gather what is known when the roof was last worked on, any receipts, any list entry number and any letter from the council, kept together in one folder. Clear a path to the side of the house, and move cars from beside the walls if possible, because a clear drive or lane gives room for a ladder or for access equipment. Make a short list of faults with the date each was first seen. Photographs from the lane, from the garden and from your own look through the loft hatch are useful to have ready before anyone calls. The survey then reads the whole roof.

09What can a Shillington householder safely check in the loft?

Switch the light off on a bright day and wait a minute for the eyes to adjust. Pinpricks of light mean holes in the covering. Dark, damp marks on rafters or insulation show where water has got in, and where each mark sits against the chimney and the eaves is worth noting down. Never step off the joists onto the ceiling below, and carry a torch. Take pictures from the hatch and send them on WhatsApp, with a line on where each was taken. If there is any chance that old sheeting or soffit material contains asbestos, touch nothing.

Get a written price for your roof

10-year workmanship guarantee, in writing

Tell us about your roof

Call WhatsApp Written quote