Cottered lies 26.2 road miles east of Dunstable, a small Hertfordshire village with a Grade II* church, a Grade I house called The Lordship and a conservation area; loft rooms, rooflines and insulation are surveyed before one written total.

Get a written quote

Call 01582 935272WhatsApp us

Council
East Herts
Road miles
26
Conservation area
Cottered
Building control
Hertfordshire BC Ltd

Roofs round The Lordship and Rumbolds

Cottered's Parish Church of St John the Baptist, a Church of England church, holds a Grade II* listing (entry 1101295, first listed 22 February 1967). The Lordship is listed Grade I (entry 1348017, first listed 19 October 1951), Rumbolds is Grade II* (entry 1175297, 22 February 1967) and Shipwrights, and Shipwrights Cottage, together make a Grade II entry (1101287). East Hertfordshire District Council has designated a Cottered conservation area, and a roofer's first question about any of these addresses is which entry or designation touches the roof, and what the council has said about it.

Cottered parish had 623 usual residents at the 2021 Census. The council that takes planning decisions here is East Herts Council; building control is run by Hertfordshire Building Control Ltd, which East Herts Council owns jointly with other Hertfordshire local authorities (operations team 01438 879990). Rooflines are covered under guttering, soffits and fascias, glazing in a slope under skylights and roof windows and tiled slopes under pitched roofing; the permitted development tests are in the planning guide.

  1. 01St John the BaptistGrade II* (entry 1101295) and Church of England: for roof repairs the church looks to its faculty regime, not to listed building consent.
  2. 02The LordshipGrade I (entry 1348017). Consent for roof work follows the building's character, so the council hears about any change of covering early.
  3. 03RumboldsGrade II* (entry 1175297). The list entry, not the survey, is where any conversation about its roof begins.
  4. 04Shipwrights CottageEntry 1101287 lists Shipwrights, and Shipwrights Cottage, at Grade II, so both roofs are read against that single listing.
A Victorian brick terrace with slate roofs and tall chimney stacks

The roof, in plain words

Fascia
The face board at the roof edge, with the gutter fixed to it.
Loft conversion
Turning roof space into a room, which brings escape and energy rules.
Escape window
A window sized so that a person can climb out of it in a fire.
Two-stage cover
NHBC's Buildmark: two years of builder warranty, then eight years of insurance cover.

The plain-as-day roof check

Loft rooms, gutters and cover for Cottered homes

4 checks about 3 minutes to read

  1. A loft room and its way out
  2. Heat loss through a roof
  3. Fascias, soffits and gutter falls
  4. The domestic client's duties

01 A loft room and its way out

Approved Document B, in its "2019 edition incorporating 2020, 2022, 2025 and 2026 amendments", ties escape routes to height. An emergency escape window serves a storey up to 4.5 m above ground. For a conversion, the document's words are "Where a new storey is added through conversion to create a storey above 4.5m", and the house then needs either a protected stairway or an alternative escape route, a top storey cut off from the floors below by fire-resisting construction (minimum REI 30) with a final exit of its own. Sprinklers in open-plan areas are a further option under paragraph 2.23.

An escape window itself has minimums: an unobstructed area of 0.33m2, at least 450mm high and 450mm wide, and an openable part whose lowest edge sits 1100mm or less above the floor. A Cottered homeowner planning a loft room is therefore dealing with building control before any rafters are cut, and a roof window that doubles as the escape route has to meet those sizes as well as its energy figures. The skylights and roof windows page explains the units.

02 Heat loss through a roof

Approved Document L 2021 sets figures by element. Table 4.2 gives new fabric in an existing dwelling a roof value of 0.15 W/m²K. For an existing roof, Table 4.3 gives a threshold of 0.35 and an improved value of 0.16. The trigger for the improved value is renovation: "More than 50% of the surface of the individual thermal element is renovated", and the document counts "Replacing the waterproof membrane on a flat roof" as renovation.

Where the improved figure is "not technically or functionally feasible", or "would not achieve a simple payback of 15 years or less", AD L takes the roof to the lowest value that is feasible, within a payback not exceeding 15 years, and says "Generally, a thermal element once upgraded should not have a U-value greater than 0.7W/(m2·K)". AD L 2026 applies from 24 March 2027, with its tables renumbered 3.2 and 3.3, so the 2021 numbers govern until then.

03 Fascias, soffits and gutter falls

White uPVC rooflines are sold with a lifespan. A retailer says its fascia boards "can typically maintain reliable performance for between 20 and 40 years" when installed correctly, and that is the retailer's claim, not a test result. A fascia that has bowed, a soffit that has cracked or a joint that has opened shows where the roofline is failing. Gutters hang from the fascia, so a weak board shows up as a gutter that sags, and a sagging gutter can overflow behind the board and wet the rafter ends.

Brett Martin says guttering should fall towards the outlet at 1mm for every 600mm. That gentle slope is hard to judge by eye, so a gutter that holds standing water or drips at a joint is the thing to look for from below. Where a roofline is replaced, the board, the gutter brackets and the fall are set together, and the guttering, soffits and fascias page lists the parts.

04 The domestic client's duties

HSE defines a domestic client as "any individual who has construction work carried out on their home, or the home of a family member, that is not done as part of any business". Under regulation 7 of the Construction (Design and Management) Regulations 2015, a domestic client's duties are carried out by "the contractor for a project where there is only one contractor", by the principal contractor when several contractors are involved, or by the principal designer where there is a written agreement to that effect.

Every project has "a construction phase plan", which the contractor draws up on a single-contractor job. In practice a Cottered homeowner is not asked to write a safety document: the contractor plans the scaffold, the edge protection and the access. The owner's part is to say what lies under the roof, where the loft is entered and who else uses the ground around the house, such as neighbours or a shared drive, since anyone passing below a roof job needs to be kept clear of it.

The dashed ring takes in the nearest towns and villages we cover around Cottered. Map tiles © Esri; map data © OpenStreetMap contributors.

Cottered roofs: loft rooms, rooflines and cover

01How long can a uPVC fascia last on a Cottered house?

A retailer says white uPVC fascia boards "can typically maintain reliable performance for between 20 and 40 years" when installed correctly. That is a seller's description and it carries its condition: correct installation. A board that bows, cracks or lifts is failing whatever its age, and the gutter it carries goes with it. A survey looks at the boards, the brackets and the fall of the gutter together, and the written total covers the roofline as one job, boards, brackets and gutter together.

02Does a loft conversion in Cottered need the roof insulated to a new standard?

Approved Document L 2021 sets an improved 0.16 for an existing roof once it is renovated or retained above the 0.35 threshold in a conversion, where that is feasible, and the payback limit is 15 years. Table 4.2's 0.15 belongs to new fabric, not to a retained roof. How the rules fall on one Cottered house is a matter for Hertfordshire Building Control Ltd, and an owner who has looked from the loft hatch at what insulation is already there can put a specific question to building control rather than a general enquiry. Rafter depth and the loft's headroom limit what can be added.

03Which energy rules apply to a Cottered roof job now, and which from 2027?

AD L 2021 applies now, with its Table 4.2 (0.15 for a new roof) and Table 4.3 (0.35 and 0.16 for an existing roof). AD L 2026 takes effect on 24 March 2027 for use in England for building work that is not higher-risk, and its tables are renumbered 3.2 and 3.3. Until that date the 2021 edition is the one in force. Building control for East Herts is Hertfordshire Building Control Ltd, on 01438 879990, and it can say which edition governs a given start date and a given job, which matters for a Cottered project that straddles the change.

04What cover does a newer Cottered home carry against defects?

NHBC says Buildmark is "a builder warranty and NHBC guarantee for two years after completion and then eight years of insurance cover against defects to certain parts of the home". Before repairs on a home still within the period, check the policy and ask the insurer how a claim works, since the cover belongs to the policy and not to a roofer. Dated photographs of the fault, made by the owner before any repair, belong with the policy papers. A home outside the period has no such cover to consult.

05What route do roof repairs at Cottered's parish church follow?

The Parish Church of St John the Baptist is Church of England, listed Grade II* (entry 1101295). Churches within the faculty jurisdiction of the Church of England use the faculty system in place of listed building consent, so the first call on any repair is the church's own advisers. The consent exemption does not cover planning, which East Herts Council decides on the ordinary tests, so both bodies are asked before a roofer quotes. Replies from each are worth keeping with the church's records, in case the question comes up again.

06What does a Grade I listing like The Lordship mean for a roof?

A listing protects a building in its entirety, roof included. The Lordship (entry 1348017) is Grade I and Rumbolds (entry 1175297) Grade II*. The consent test is whether works are carried out "in any manner which would affect its character as a building of special architectural or historic interest", so a patch in matching material is judged apart from a change of covering. Put the question to East Herts Council, with the entry number and a photograph of the roof slope in question.

07Does the Cottered conservation area change a re-roof?

East Hertfordshire District Council has designated a Cottered conservation area, and the council says whether an address sits inside it. An Article 4 direction can remove further permitted development rights, so we check with the council first. For re-roofing, see the planning guide and its tests. Ask for the reply in writing and keep it: a solicitor acting for a buyer may want to see that the roof work was checked before it started, and a council reply answers that without anyone having to reconstruct what was said years later.

08Which licence covers scaffolding on a Cottered road, and what does it cost?

Scaffold on a Cottered pavement or road needs a scaffold licence. Hertfordshire County Council, the highway authority for Cottered, sets £134 for a licence lasting 14 days and £59 for every week beyond that, and the council states "It usually takes 3 weeks to process an application", with 1.2 m of footway kept clear as a condition. We arrange the licence with our scaffolder. Scaffold standing wholly on the owner's land raises no highway licence question, and the survey of a Cottered house shows which case applies, together with how the roof is accessed and where the scaffold would stand.

09How can a Cottered homeowner prepare for a roof survey?

Look from the loft hatch for any damp patch on the underside of the roof, and note where any stain, drip or draught has been noticed inside the house. Keep any earlier quotes, building control letters or council replies together, since they show what has been done and agreed. Photographs of the roof from the ground, taken from across the road in good light, help too. The survey then looks at the covering, the roofline and the chimney from outside, and a written total follows it, with a plain account of anything else seen on the roof, including the state of the gutters.