Call 01582 935272

Datchworth · 21 road miles east

Roofers in Datchworth

Datchworth lies 21 road miles east of Dunstable. Outbuilding sheets, undersized gutters, water butts and full re-roofs there are looked at in a survey, then quoted as one written total.

Get a written quote

Call 01582 935272WhatsApp us

Council
East Herts
Road miles
21
Building control
Hertfordshire BC Ltd

Roofs round All Saints and Staples Farmhouse

Datchworth is a village in Hertfordshire, about 39 minutes from Dunstable by road and 21 road miles to the east. At the 2021 Census, Datchworth parish had 1,513 usual residents. Planning applications for a Datchworth house go to East Herts Council. Conservation areas at Stockens Green and at Deard's End Lane, both in Knebworth and designated by North Hertfordshire District Council, lie close to the village; for a Datchworth address, check with East Herts Council whether any control applies. The village's own listed buildings include a Grade II* church and a Grade II* farmhouse, so a roof near either has more to consider than a plain house.

Building control for Datchworth is Hertfordshire Building Control Ltd, which East Herts Council owns jointly with other Hertfordshire local authorities; its operations team is on 01438 879990. The planning guide explains permitted development for house roofs. Garage and outbuilding roofs fall under flat roofing or pitched roofing, depending on their shape, and the gutters, soffits and fascias page covers the roofline. Small outbuildings count as roofs too, and the survey includes them where asked.

  1. 01Church of All SaintsA Church of England church, listed Grade II*, National Heritage List entry 1341457, first listed on 24 November 1966.
  2. 02Staples FarmhouseListed Grade II*, National Heritage List entry 1175159, first listed on 24 November 1966, so its roof is a question for the council.
  3. 0368, Bury LaneListed Grade II, National Heritage List entry 1089126, first listed on 11 June 1986; consent questions come before any roof change.
  4. 04InnisfreeListed Grade II, National Heritage List entry 1341458, where listed building consent is the starting point for roof work.
Concrete tiled estate rooftops towards green hills

Datchworth roof words

Fragile sheet
A roof sheet that cannot carry a person and gives way underfoot.
Diverter
A fitting that sends downpipe water into a butt and the rest to the drain.
Gutter capacity
How much water a gutter and its outlets can carry before overflowing.
Eaves gap
The space between the wall and the roof covering at the lowest edge.

The plain-as-day roof check

Four checks, from sheet roofs to the water butt

4 checks about 3 minutes to read

  1. Fragile sheets on outbuildings
  2. Gutter capacity and overflow
  3. Water butts and diverters
  4. Eaves gaps and nesting birds

01 Fragile sheets on outbuildings

Garages, sheds and farm stores in a village like this can carry roofs of cement-based sheets, and some of those are asbestos cement. HSE puts it flatly: "AC roofs are always fragile". A sheet that looks sound can break under a person's weight, and a fall through one is serious. Nobody should step on such a roof, and a ladder should never be laid against the sheeting. A garage door that sticks in wet weather can mean a sagging sheet roof above it.

Look at an outbuilding roof from the ground. Cracks, green growth in the corrugations, a sag between supports and patched holes show age. HSE also says: "If the building was built or refurbished before 2000, assume that there is asbestos in it." A photograph from the ground, sent on WhatsApp to 07880 284133, lets the survey plan access before anyone goes up.

02 Gutter capacity and overflow

A gutter has to carry the water from a whole roof slope to its outlets. If it is too small, or an outlet is too far away, it overflows in heavy rain even when it is clean. Look for staining below the front edge of the gutter, green streaks on the wall under joints, and a lip that throws water over instead of in. A hose run onto a clean roof for a few minutes shows where the gutter overflows first.

A gutter wants a fall of 1 mm for every 600 mm towards the outlet, Brett Martin says, so a run that has sagged also loses capacity. A longer slope sends more water down, and a roof extended without changing the gutters can overload them. The survey measures what is there and says whether the fault is blockage, sag or size. Fascia boards and brackets are part of the same look, because a gutter can only stay in line if what holds it is sound. A bucket test on one length shows how it drains.

03 Water butts and diverters

A water butt takes roof water from a downpipe through a diverter, and the overflow goes on to the drain or soakaway. If the diverter clogs or the butt is full and its overflow points the wrong way, water spills against the wall. Look at the butt's overflow, the ground around its base and the downpipe above for staining. Moss or algae on the butt's lid tells nothing about the roof above.

A full butt in a wet spell is working as intended. The problem is an overflow that discharges next to the wall instead of away from it, or a lid that has gone missing. If the butt sits on soft ground, its base can tilt and tear the connection. A gutter job and a butt belong to the same drainage line, so mention the butt when a gutter is being looked at. Raising the butt on a firm base keeps its connection square.

04 Eaves gaps and nesting birds

Birds nest in the gap where the roof covering meets the wall. Droppings below the eaves, straw or twigs hanging from the gap, and a steady traffic of birds in spring are all signs. The gap that lets them in is also a route for rain and for wind-driven snow, so it is worth closing once the nest is no longer in use. A torch at dusk shows the gap more clearly than daylight does.

The Wildlife and Countryside Act 1981 protects the nest of any wild bird "while that nest is in use or being built". The eaves are left alone while a nest is active, and a repair there is planned around it rather than through it. The survey checks the gap, the fascia and the soffit, and a photograph taken from a distance, without disturbing anything, helps. The gap can be closed with a proper eaves comb or filler once the nest is no longer in use.

The dashed ring takes in the nearest towns and villages we cover around Datchworth. Map tiles © Esri; map data © OpenStreetMap contributors.

Datchworth roof questions, explained plainly

01How do I know if a Datchworth outbuilding roof is made of fragile sheets?

Corrugated or flat cement-based sheets on a garage, shed or store are the likely candidates, and some are asbestos cement. HSE's wording is that "AC roofs are always fragile", so no one walks on one. Look from the ground for cracking, sag between supports and patched holes, and send a photograph before anyone goes up. The survey plans access around the sheets, reports plainly what it finds, and quotes one written total for any repair or replacement. A ladder is never leant on the sheeting. Sheets that have been painted over cannot be recognised by colour, and age tells little.

02Is Datchworth near a conservation area?

The Stockens Green and Deard's End Lane conservation areas at Knebworth, both North Hertfordshire District Council's, lie close to Datchworth. East Herts Council can say whether any control applies to a particular Datchworth address, and a roof near the edge of either area is worth a call before a covering is chosen. An Article 4 direction can remove further permitted development rights, so we check with the council first. The council holds the maps, and a roofer does not, so the answer to the boundary question has to come from it. The same call can cover any roof window planned for the back of the house.

03Who approves roof repairs at Datchworth's All Saints church?

All Saints is listed Grade II* (list entry 1341457) and belongs to the Church of England. For a Church of England church that is open for worship, approval for building work follows the faculty system and not listed building consent. "The like for like replacement of roof lead or other material covering the roof of a listed building" is cleared by the archdeacon's written notice alone. For outside work, planning permission from East Herts Council can still be needed. The church's consent route has no bearing on a house roof in the village.

04Do Staples Farmhouse, 68 Bury Lane and Innisfree share one consent rule?

Staples Farmhouse is Grade II* (list entry 1175159); 68, Bury Lane (list entry 1089126) and Innisfree (list entry 1341458) are Grade II. For each, listed building consent is the question for any work that would affect the building "in any manner which would affect its character as a building of special architectural or historic interest". East Herts Council says whether a roof job does, and its answer comes first, whatever the size of the house. A snapshot of the front elevation gives the council a first view. The lane approach gives a clear view of the pitch and the ridge.

05Who licenses scaffolding in a Datchworth lane?

Where scaffold sits on the road or footway, Hertfordshire County Council, the highway authority, licenses it; East Herts Council does not. The charge from Hertfordshire County Council is £134 for 14 days and £59 for each week after, and it states: "It usually takes 3 weeks to process an application." A clear 1.2 m walkway stays open for pedestrians. We arrange the licence with our scaffolder, and whatever scaffold the work calls for forms part of the single written total. A wide drive can keep the tower off the road altogether. A drive or garden with room can mean no licence is asked for at all.

06Which body deals with Building Regulations for a Datchworth re-roof?

Hertfordshire Building Control Ltd, which East Herts Council owns jointly with other Hertfordshire local authorities, is the building control body for Datchworth, and the Hertfordshire Building Control Ltd operations team is on 01438 879990. The Planning Portal's guide says re-roofing is normally outside the application rules when "Less than 25 per cent of the total 'building envelope'" is affected and "Less than 50 per cent of the roof is affected". A whole new covering passes the roof limit, so approval is needed, and a covering heavier by 15 per cent or more brings in approval as well, with a structural engineer or surveyor consulted first. Asking the operations team early shows which route applies to the job.

07What does HSE say about removing asbestos cement sheets?

Roof sheeting made of asbestos cement can be removed carefully, without breaking it up, as non-licensed work. Where cement is badly damaged or already broken up, the work is notifiable non-licensed work. Most work on asbestos insulating board is licensed. Use a lockable skip for asbestos; the household exemption from consignment notes covers domestic hazardous waste "other than asbestos waste". Nobody should drill, scrub or break a suspect sheet, and a photograph from the ground is the safe first step. Nothing is lifted until the material is known. A sheet that looks harmless from below may still be asbestos cement, so the material is established before anything is touched.

08What if birds are nesting in the eaves of a Datchworth house?

The nest of a wild bird is protected "while that nest is in use or being built", so the eaves are left alone until the nest has been finished with. The offence is committed by someone acting "intentionally". Bats are separate: a roost harmed is an offence whatever the intent behind it. A photograph from the lane, without going near the gap, tells the survey what is there, and the repair is planned around it, with advice sought where a roost is suspected. A roost can be present even where no bats are seen in the day.

09What ranges do published guides give for single roof parts?

Which? Trusted Traders give £75 to £400 for one to six tiles, £80 to £300 for a new ridge tile and £75 to £350 for a clear-out of every gutter, front and back, excluding VAT, from a survey of 11 traders in November 2025. They are ranges, and they say nothing about a particular Datchworth roof. Hips are not priced from ridge figures, and a chimney is priced after a survey. A written total, in plain words, follows the survey of the roof in question, covering every part the survey found worth doing. The gutter figure is for clearing, not for repairing or replacing a run.

Get a written price for your roof

10-year workmanship guarantee, in writing

Tell us about your roof

Call WhatsApp Written quote