Call 01582 935272

Markyate · 5 road miles south-east

Roofers in Markyate

Markyate is a south-east village, 4.6 road miles from Dunstable and about 8 minutes by road. Ahead of any price comes a survey of the roof, and the price is given as one written total.

Get a written quote

Call 01582 935272WhatsApp us

Council
Dacorum Borough
Road miles
5
Conservation area
Markyate
Building control
Check with the council

Roofs round Cell Park and the High Street

Markyate parish had 3,415 usual residents at the 2021 Census. St John the Baptist's church is listed Grade II* (National Heritage List entry 1101241, first listed 26 January 1967) and Cell Park is listed Grade II* (entry 1173939, first listed 22 October 1952). The Sun Inn is Grade II (entry 1101208, first listed 26 January 1967), and so is 72, High Street (entry 1348050). Listing leaves permitted development rights for roof work with the owner, and listed building consent is what any alteration to character needs.

Markyate Conservation Area is designated by Dacorum Borough Council, which is also the local planning authority. For building regulations on a roof, check with Dacorum Borough Council's building control team. The planning guide carries the roof tests, and the chimney repairs and skylights and roof windows pages describe two of the jobs.

  1. 01St John's churchGrade II* listed. Church of England practice applies: a faculty for roof work, plus a separate planning question for the exterior.
  2. 02Cell ParkListed Grade II* (entry 1173939): a roof alteration that reaches its character needs listed building consent.
  3. 03The Sun InnA Grade II listing (entry 1101208) covers the inn, so any change to its roof is read against that entry.
  4. 0472 High StreetListed Grade II (entry 1348050); mending to match is one question, and altering the covering another, for the council.
A row of low bungalow roofs on the flat land of the Selsey peninsula

The roof, in plain words

Highway authority
The body responsible for a road and its pavement, which licenses scaffolds over them.
Abutment
The joint at a roof's high edge where it butts a taller wall.
Rooflight
A glazed unit raised on an upstand, standing proud of the slope.
Party structure
A wall or floor shared between two owners' buildings.

The plain-as-day roof check

Scaffold, stack, tile and window: reading a Markyate roof

4 checks about 3 minutes to read

  1. Scaffold licence terms in Hertfordshire
  2. A chimney breast shared with next door
  3. How long tiles can be expected to last
  4. Roof windows and kerbed lights

01 Scaffold licence terms in Hertfordshire

In Hertfordshire the highway authority is Hertfordshire County Council, and its scaffolding licence page says "It costs £134 for a 14 day licence. It's £59 for every week after." It adds "It usually takes 3 weeks to process an application." The district council does not issue it. "A 1.2m clear walkway must be maintained at all times on the footway."

The same page says "You could be fined up to £5,000 if you don't get a licence." It asks for insurance of a "minimum of £10 million" and says a renewal must be made "no later than five working days before the expiry". We arrange the licence with our scaffolder for the period the Markyate job is expected to need, and a scaffold that has to stay up beyond its first period can be renewed. The number of days applied for follows the length of the job, so a repair that runs past the first 14 days carries the weekly charge for each further week, which is part of why the layout and the licence are settled together.

02 A chimney breast shared with next door

A pair of houses can share a chimney breast on the party wall. Taking one out is a party structure job, and the Party Wall etc. Act 1996 lets the building owner "cut away from a party wall, party fence wall, external wall or boundary wall any footing or any projecting chimney breast, jamb or flue" once notice has been served at least two months ahead.

Building regulations are separate: "Building regulations approval will always apply when removing chimney breasts". For Markyate, ask Dacorum Borough Council's building control team about the route. MyJobQuote's page of 3 November 2026 gives around £2,500 as what taking out a chimney breast averages, and around £3,000 to £3,500 where the entire stack goes with the breast. These are averages from a guide and are no substitute for a written total from a survey. Where the stack comes down, the roof is closed over the gap, and that closure needs its own lead and tiling.

03 How long tiles can be expected to last

Marley reports that "For clay roof tiles, the BRE determined a minimum life expectancy of 60 years", and gives a wider line for roof tiles, with the words "This is not a guarantee or warranty of its longevity." HomeBuilding's approximate lifespans, on a page last updated 30 September 2025, are 60-80 years for clay tiles and 40-50 years for plain concrete.

A lifespan describes a kind of tile in sound condition. The nails, battens, underlay and ridge bedding each age separately, so a roof can need repair while its tiles still have life. A hairline crack in a tile can be hard to see from the ground, so a close look at each slope belongs to the survey rather than to guesswork. Look from the ground for cracked or delaminating faces, a tile edge that has lifted, and a patch of different tile where an earlier repair was made. Photographs sent on WhatsApp let us look at what you can see before a visit.

04 Roof windows and kerbed lights

Approved Document L's Appendix A treats two glazed units differently. A rooflight is installed "out of plane with the surface of the roof on a kerb or upstand", while a roof window is installed "in the same orientation as, and in plane with, the surrounding roof". In Table 4.2 a rooflight is held to 2.2 W/m²K, where a roof window must reach 1.4 or "Band B minimum" on the scale of Window Energy Ratings.

MyJobQuote's page of 22 September 2026 gives £1,100 as its average for the standard mid-range Velux window. For a listed roof such as Cell Park's, listed building consent is the first question, and the council is asked before a new opening is priced. Dormers are covered in the planning guide, not here. The skylights and roof windows page covers the work.

The dashed ring takes in the nearest towns and villages we cover around Markyate. Map tiles © Esri; map data © OpenStreetMap contributors.

Markyate roof questions: scaffold, conservation area, listings

01What can be seen of a Markyate chimney stack from the garden?

From the garden, look at the pots and the flaunching round them for cracks, at the brickwork for open joints or a lean, and at the lead along the foot of the stack for a lifted edge. A stack on the party wall is shared ground, so any work to it touches the neighbour. A photograph of each face of the stack, sent over WhatsApp, gives us something to work from; the survey that follows reads the flashings and the stack itself from the roof. Mortar crumbling at the joints, a pot that has shifted and a tide-mark on the wallpaper beside the breast all belong in the photographs, because each points to a different part of the stack.

02Does Markyate Conservation Area alter the planning route for my roof?

Markyate has a conservation area, designated by Dacorum Borough Council. Whether an individual address is inside it is for the council to confirm, and the council is also where any question about permitted development rights goes. A conservation-area boundary can pass between two neighbouring houses on the same Markyate street, which is why the full address matters to Dacorum Borough Council and a street name alone is not enough. An Article 4 direction can remove further permitted development rights, so we check with the council first. For building regulations on the roof, check with Dacorum Borough Council's building control team.

03How does St John's church get consent for a roof repair?

St John the Baptist's church is Church of England and in use, listed Grade II*, so work goes through the faculty system and not listed building consent. Replacing roof lead or covering like for like is a List B case, which can go ahead on the archdeacon's notice in writing. Exterior work can raise a separate planning question, which is put to Dacorum Borough Council. Other buildings in the village, such as The Sun Inn, follow listed building consent, and the council rules on whether a repair amounts to an alteration to character. The church's own system does not extend to them.

04What do Hertfordshire's scaffold licence rules mean for a Markyate house?

Hertfordshire County Council licenses scaffolds on its roads at £134 for a 14-day licence and £59 for every week after, and "It usually takes 3 weeks to process an application." We arrange the licence with our scaffolder. The county's page also says "A 1.2m clear walkway must be maintained at all times on the footway." A house on the High Street, with shops and a pavement in use, is planned differently from a house set back behind a drive, so the survey takes in the frontage. The district council plays no part in issuing the licence.

05What do guides say about replacing a few tiles on a Markyate roof?

Which? Trusted Traders' November 2025 guide, excluding VAT, gives £75 to £400 for a small tile repair of one to six pieces. MyJobQuote's page of 6 October 2026 gives around £215 for the average cost of replacing roof tiles and around £650 for the average roof repair in 2026. The figures come from different guides and are not combined. A Markyate total comes from a survey and follows what the roof needs. The number of tiles, the height of the roof, how the slope is reached and whether the battens beneath are sound all change it.

06Do Cell Park's grade and the High Street listings need different consent from a house?

Yes, where the work touches their character. Cell Park, the Sun Inn and 72, High Street are buildings with listings, and the test for each is the same: works "in any manner which would affect its character as a building of special architectural or historic interest" need listed building consent. The church is the exception, with its faculty system. The grade of a building does not change the route; the council is asked about a re-cover or a new opening. Cell Park's Grade II* status ranks it higher than the inn, but the consent wording is the same for both.

07Is it worth asking an insurer first when a Markyate roof loses tiles in a storm?

Tell your insurer, and photograph the damage before anything is moved. Dated pictures from the ground and from any window that overlooks the roof are what an insurer's surveyor will want to compare with their own. The Financial Ombudsman Service says it will "usually look at expert reports and photos" and that "Rain, hail or snowfall by itself can constitute a storm". MyJobQuote's emergency page of 22 October 2026 says call-out costs "typically range from £150 to £300", and extensive storm damage repairs can cost £1,200 or more. Those are third-party figures for the country.

08Does a roof extension next to a Markyate neighbour need a party wall notice?

Where the building owner is building a wall on the line of junction, the Act requires notice "at least one month before he intends the building work to start". Work to a party structure needs notice of at least two months. If the adjoining owner stays silent for 14 days they count as having dissented, and the section 10 procedure follows: a surveyor, not a veto. Party wall questions go to a party wall surveyor and not to building control.

09What does a Markyate homeowner owe a contractor under CDM 2015?

A domestic client's duties under CDM 2015 pass to "the contractor for a project where there is only one contractor", and, where there are several, to the principal contractor. HSE's guidance reads "A domestic client is any individual who has construction work carried out on their home, or the home of a family member, that is not done as part of any business." The contractor prepares "a construction phase plan" for the project. A homeowner can ask to see the plan and the dates before work starts, and a small roof job can have a short plan. The client's duties still sit with the contractor, so the plan is the document to ask for.

Get a written price for your roof

10-year workmanship guarantee, in writing

Tell us about your roof

Call WhatsApp Written quote