Call 01582 935272

Tewin · 21 road miles east

Roofers in Tewin

Tewin sits 21.4 road miles east of Dunstable in Hertfordshire; its Grade I church, listed Lower Green buildings and conservation area frame its roof work, which ends in one written total price.

Get a written quote

Call 01582 935272WhatsApp us

Council
East Herts
Road miles
21
Conservation area
Tewin
Building control
Hertfordshire BC Ltd

Roofs round St Peter's and Lower Green

Grade I is the listing held by Tewin's Church of St Peter (National Heritage List entry 1341477, first listed 24 November 1966). Along Lower Green the list names number 30 (entry 1341480), numbers 8 and 9 together (entry 1055835) and Cowper Cottage (entry 1089092), all at Grade II. East Hertfordshire District Council has also designated a Tewin conservation area. A listed house is not frozen: listed building consent is needed for alterations made "in any manner which would affect its character as a building of special architectural or historic interest", and the council alone decides whether a repair here would count as altering character, and whether the conservation area plays a part as well.

East Herts Council decides planning questions for Tewin. In East Herts, building control is provided by Hertfordshire Building Control Ltd, which East Herts Council owns jointly with other Hertfordshire local authorities (operations team 01438 879990). Tewin parish had 1,596 usual residents at the 2021 Census. The planning guide carries the re-roofing tests, and two details that a survey of any pitched roof examines, the chimney stack and the lead round it, have pages of their own under chimney repairs and lead roofing.

  1. 01St Peter's churchGrade I (entry 1341477). This is a Church of England church, and its roof work is dealt with by faculty, not listed building consent.
  2. 0230, Lower GreenGrade II (entry 1341480). A different covering or a reshaped roofline needs raising with the council early, before anything is ordered.
  3. 038 and 9, Lower GreenEntry 1055835 lists the pair at Grade II, so the council has to be asked what a repair to either roof needs.
  4. 04Cowper CottageEntry 1089092, Grade II. Consent follows character, so a new covering and a changed chimney are both worth raising early.
The worn felt roof and cheeks of a box dormer on a chalet bungalow

The roof, in plain words

Faculty
Church of England permission for work on a church that is in use.
Flaunching
The sloped mortar crown of a chimney stack, which grips the pots.
Batten
Timber lath nailed across the rafters; each row of tiles hooks onto one.
Roost
The spot a bat shelters or breeds in, protected even when it is empty.

The plain-as-day roof check

Four checks for a roof near St Peter's church

4 checks about 3 minutes to read

  1. Church roof lead
  2. Stack, pots and flaunching
  3. Battens and tile fixings
  4. Eaves, nests and roosts

01 Church roof lead

A Church of England church in use, such as St Peter's, sits within the faculty jurisdiction of the Church of England, so a faculty stands where listed building consent would otherwise be. The Faculty Jurisdiction Rules 2015 carry a short list of matters called List B, and one entry reads "The like for like replacement of roof lead or other material covering the roof of a listed building"; for those, the archdeacon's written notice suffices without a full faculty. Planning has its own tests, and the faculty route does not remove that step for outside work.

Lead is the soft metal that seals a roof's joins and edges, and MyJobQuote says correctly installed lead flashing can last for over 80 years. From the churchyard path or the pavement, anyone can look for lead lifted away from stonework, split at a fold or pulled out of its slot in the wall. Those are observations to pass on to whoever looks after the building, not a prompt to climb up and test. A flashing that has been smeared with sealant, rather than lifted and relaid, is worth mentioning as well. The lead roofing page describes how flashings, valleys and soakers are made and fixed.

02 Stack, pots and flaunching

A chimney stack is brickwork that rises through the roof, topped by pots bedded in sloped mortar called flaunching. Lead flashings seal the base where the stack meets the slope. A survey of a stack takes in leaning pots, cracked flaunching, open mortar joints and lead lifting from the brick, because each of those admits water to the flue or the roof timbers underneath. Brick that flakes or crumbles by the pots is worth noting too, as is any stack that leans, since a leaning stack is a structural question, not only a weatherproofing one.

Taking out a chimney breast is its own job. In the Planning Portal's words, "Building regulations approval will always apply when removing chimney breasts". If the breast is shared with next door, a party wall notice is needed as well, and it must "be served at least two months before the date on which the proposed work will begin". MyJobQuote averages around £2,500 for removing a breast (page dated 3 November 2026). A Tewin stack is judged together with the slopes beside it, since water getting in at one can show up at the other.

03 Battens and tile fixings

Battens are timber laths nailed across the rafters, and tiles hook onto them over a layer of underlay. BS 5534 is the British Standard code for slating and tiling. Marley notes that installing to it "isn't required by law", but also that since the 2015 amendments mortar "could no longer be relied upon as the only means of securing the roof covering". Where mortar alone holds a ridge or verge, ask the roofer how it is fixed.

BS 5534 gives minimum fixings, and Marley says they "will always be superseded by the generation of a Fixing Specification, which is site specific", so exposure is built into the specification for the roof in question. On the ridge and the hips, tiles are secured with mechanical fixings, and the size of each is chosen from the wind uplift calculation. In a loft, look at whether the battens are firm and whether nail heads have rusted; outside, look along the rows for tiles that have slid, chipped or lifted.

04 Eaves, nests and roosts

Birds can nest under tiles and behind fascia boards. Section 1 of the Wildlife and Countryside Act 1981 makes it an offence to act intentionally against a wild bird's nest "while that nest is in use or being built". An occupied nest therefore holds up work at the eaves, and the job is sequenced around the birds.

Bats are covered more tightly. Regulation 43(1)(d) of the Habitats Regulations 2017 reaches anyone who "damages or destroys a breeding site or resting place of such an animal", with no mention of intent, and Natural England licences can be needed for roof work: GOV.UK includes "repairing or replacing a roof" in its list. If a bat turns up in a loft or at the eaves, hold off and get advice before roof work goes ahead.

The dashed ring takes in the nearest towns and villages we cover around Tewin. Map tiles © Esri; map data © OpenStreetMap contributors.

Tewin roofs and listed buildings, answered

01What does a roof survey in Tewin look at around a chimney stack?

The survey starts with the brick and the cap on top, follows the lead flashing round the base, then works round the slope beside the stack for slipped tiles and lifted lead; and a photograph of any stain on your own ceiling or loft timbers helps. A stack is read together with the roof around it, since a failed flashing shows up as a mark well away from the brickwork. Any repair is priced inside a single written total, and the chimney repairs page explains what the work involves, from repointing to rebuilding, so that the quote can be read against it. If the survey finds the stack sound and only the flashing failing, you are told so plainly, along with other faults seen on the roof while the surveyor was up there.

02Does a Lower Green listing change how a roof is repaired in Tewin?

It can. Number 30 (entry 1341480), numbers 8 and 9 (entry 1055835) and Cowper Cottage (entry 1089092) are listed Grade II, and listing brings a test about character: a different covering or a changed roofline touches character in a way that a matching patch may not. East Herts Council can say which side of the line a repair falls on for one address, and a reply kept in writing with the deeds tells the next owner exactly what was agreed.

03How does the Tewin conservation area bear on re-roofing a house?

East Hertfordshire District Council designated Tewin's conservation area, and whether a particular address lies inside it is a question for the council. Ask the council first, and read the planning guide for how ordinary re-roofing of a house is treated. Beyond that, an Article 4 direction can remove further permitted development rights, so we check with the council first, and its reply means the quote rests on a confirmed route rather than a guess. A Tewin owner who has already spoken to the council can pass that reply on, and it saves a round of questions.

04What does scaffolding cost on a Tewin road or pavement?

Hertfordshire County Council is the highway authority for Tewin, and its scaffold licence costs £134 for 14 days, with £59 for every week after. Hertfordshire County Council states "It usually takes 3 weeks to process an application", and a licence conditions 1.2 m of footway kept clear. We arrange the licence with our scaffolder. Scaffold kept wholly within the property boundary does not need a highway licence; which case a Tewin house falls into is something the survey shows. The scaffold is part of the written quote.

05Does re-roofing a Tewin house need Building Regulations approval?

The Planning Portal's interactive guide lists two limits under which an application is normally not needed: work affecting "Less than 25 per cent of the total 'building envelope'" and "Less than 50 per cent of the roof is affected". A whole new roof exceeds the second of those limits, and the Portal's main page adds: "In most situations, this work will need Building Regulations approval." Where the new covering is 15 per cent or more heavier, approval is needed whatever share of the roof is replaced. In Tewin the application goes to Hertfordshire Building Control Ltd, operations team 01438 879990.

06Can the roof of St Peter's be repaired without a faculty?

St Peter's is a Church of England church, and the faculty system covers it. The Faculty Jurisdiction Rules place the like for like replacement of lead, or of any other roof covering, on List B, which lets the archdeacon's written notice do the work of a full faculty. A repair that goes beyond like for like is outside List B. Planning for the exterior is a distinct matter. East Herts Council answers that side, and planning permission for exterior changes may still apply.

07What would a new roof cost for a Tewin three-bedroom house, per outside guides?

Which? Trusted Traders give £7,000 to £21,000, excluding VAT, for "Replacing entire roof on an average three-bedroom house", from a survey of 11 traders in November 2025. HomeBuilding, last updated 30 September 2025, says that "a standard three-bedroom semi with a 65m² roof and plain concrete tiles may cost between £10,000 and £15,000". These are outside figures, not ours. For a Tewin house, size, covering and access decide the number, and the written quote is one total price after a survey. Replacing a few slipped tiles or a failed flashing is a repair, priced far below a whole new roof, so a repair quote is a different thing to compare.

08How much fall should a gutter have on a Tewin house?

Brett Martin's guidance sets the slope at 1mm for every 600mm of gutter, falling towards the outlet. The fall is too slight to judge by eye from the garden, yet enough to keep the water moving. From below, a gutter that holds a standing pool, drips at a joint or sags between brackets is a gutter in trouble, and the pitched roofing page covers the roof above it, including the eaves where the gutter is fixed and where fascia boards meet the tiles.

09Is a WhatsApp photo useful before anyone surveys a Tewin roof?

A photo sent to 07880 284133 is looked at, and the most useful ones show the whole slope first, then a close shot of the damage with a chimney or wall in frame for scale. It narrows the question, but it cannot replace the survey, because lifted lead, cracked tiles and loose fixings close to a stack are hard to judge from the ground, even with a good zoom lens. The same team answers 01582 935272, and the survey comes before the written price.

Get a written price for your roof

10-year workmanship guarantee, in writing

Tell us about your roof

Call WhatsApp Written quote