Do I need scaffolding for a roof repair?

Mending a ground-floor extension roof and mending the ridge of a tall terrace are different jobs for access. Scaffold is chosen by the height, the position and the work involved.

Get a written quote

Call 01582 935272WhatsApp us

A slipped slate and a rusted nail on a natural slate roof Close-up of a natural blue-grey slate roof with one slate slipped out of its course and a rusted nail head visible, moss in the joints
PicturedA slipped slate and a rusted nail on a natural slate roof Close-up of a natural blue-grey slate roof with one slate slipped out of its course and a rusted nail head visible, moss in the joints.

The short answer

Not always: small, low repairs can sometimes be reached with a ladder or a tower, while work at height, at edges or above a footway calls for scaffold. Scaffolding on the pavement or road needs a scaffold licence. We arrange the licence with our scaffolder.

A roof drawing with its parts named: ridge tiles, tiles, battens, underlay, raftersRidge tilesTilesBattensUnderlayRafters

What decides the access

Access is chosen for each roof, and three things carry most of the weight: how high the work is, how the roof is shaped around it, and what has to be done. A single tile near the eaves of a bungalow is a different proposition from flashing at the base of a chimney on a tall house, even though both count as repairs.

Height comes first. The higher the eaves, the more a ladder becomes a poor way to work, because a ladder is a way to climb up and not a place to stand for an hour with a bucket of mortar. Roof ladders, towers and scaffold all give a flat, supported platform for the person doing the job.

The position of the fault is next. Work at an edge, such as a verge, a fascia or a gutter, puts someone close to a drop, and edge protection is the normal answer. Work partway up a slope can sometimes be reached with a roof ladder that spreads the load, but that depends on the covering and its condition.

The type of job decides the rest. Lifting out a chimney's flashing or rebuilding a section of ridge involves carrying materials up, working for longer and keeping people clear below, and all of that points to scaffold. A quick look at a roof from a platform can be a different matter.

Scaffold across the pavement

Where scaffold is needed, it may have to go on the pavement or over it, and that brings in the law. Section 169 of the Highways Act 1980 says nobody may "erect or retain on or over a highway any scaffolding or other structure which obstructs the highway" without a licence. The permit is a scaffold licence, and the council that looks after that road issues it.

In Dunstable and the surrounding area, Central Bedfordshire Council licenses scaffolding on its roads. Elsewhere it is the council that looks after the road, so a different council can be involved a few miles away, and in Hertfordshire it is the county council. We arrange the licence with our scaffolder for each address.

Scaffold on your own land, wholly inside the boundary, needs no licence from the highway authority, and a drive or a back garden is one place for it. Trunk roads, such as the M1, belong to National Highways, which is a separate authority.

A licence takes time to process, and some councils publish how long. For that reason, the scaffold is part of the planning of a repair and not an afterthought, and our page on how long a roof repair takes covers the timing.

Where scaffold fits in a quote

Where a repair calls for scaffold, its cost is built into the written price, one total, given after the survey. The points below are worth knowing when you compare prices from different firms.

  • Ask each firm what its price covers, and whether access for the work is part of it.
  • Check who arranges and pays for any highway licence.
  • Compare like with like: a price for work from a ladder is not the same as a price for work from scaffold.
  • Ask whether the price allows for the scaffold staying up if the weather delays the job.

What sets the cost of access is the height, the length of the elevation being worked on, how long the scaffold stands and whether a licence is needed, and the survey settles each of those before the price is written. A repair to one chimney needs far less access than one that runs the length of a terrace, which is why the figure varies so much between jobs.

Our guide to roof repair costs sets out what moves the cost of a repair, and the roof repairs page describes the jobs that need access.

Scaffold, ladders and licences for repairs

01Can a small repair be done from a ladder?

Sometimes. A low, simple job at the lowest edge may be reached from a ladder that is footed properly on firm ground, but a ladder is poor support for a long job or for carrying tiles up. If the work is at height, at an edge or around a chimney, a roofer is likely to prefer scaffold or a tower. The decision is made at the survey.

02Who sorts out the highway licence for the scaffold?

For our jobs, we arrange the licence with our scaffolder, whichever council area the house is in. Luton Council, for one, says its licence is issued to the scaffolding company, and that rule belongs to Luton streets alone. You do not have to chase any of that yourself, and another firm's quote is worth checking for what it says about scaffold before you agree to a price.

03Does scaffold on my own drive need the council's permission?

Not a highway licence, provided every pole and board stays on your own land and nothing reaches over the footway. If any part projects over the highway, section 169 applies. If a licence does turn out to be needed, we arrange the licence with our scaffolder, so tell us where the access is and whether a car or a gate is in the way.

04Does scaffold make a roof repair slower to start?

It can, because a licence takes time to process where the scaffold goes on the highway, and the scaffold has to be erected first. Where no licence is needed, that step falls away. Any date for the repair depends on the weather as well as the access, so ask for the scaffold position to be settled at the survey, or call 01582 935272.