Call 01582 935272

Northaw · 26 road miles south-east

Roofers in Northaw

Trees over roofs, heavier coverings, listed-roof briefs and the paperwork that follows a re-cover in Northaw, 26.2 road miles south-east of Dunstable, priced as one total.

Get a written quote

Call 01582 935272WhatsApp us

Council
Welwyn Hatfield Borough
Road miles
26
Conservation area
Northaw historic core
Building control
Check with the council

Roofs round Northaw Place and St Thomas a Becket

Northaw is a village in Hertfordshire, a 36-minute drive from Dunstable and 26.2 road miles away, with Dunstable lying to the north-west. At the 2021 Census, Northaw and Cuffley parish had 5,642 usual residents. Welwyn Hatfield Borough Council handles planning for houses in the village. On Building Regulations, check with Welwyn Hatfield Borough Council's building control team before a covering is removed, so that the route is clear before work begins on a Northaw house.

The conservation area at Northaw, listed by Welwyn Hatfield Borough Council as the Northaw historic core, carries that council's designation, and which side of its line a house stands is for the council to say. Check with Welwyn Hatfield Borough Council whether an Article 4 direction applies to the house. The planning guide sets out the roof rules, the slate roofing hub describes slate work, and the roof replacement hub describes whole new coverings.

  1. 01St Thomas a Becket churchGrade II* (entry 1348170), first listed 9 December 1983, and a Church of England church.
  2. 02The Dower HouseListed Grade II*, entry 1348167, first listed 30 March 1966; roof work there is a council question first.
  3. 03Northaw PlaceListed Grade II*, entry 1100972, first listed 6 February 1952, so its roof is judged against its listing.
  4. 04Judges, the former SunJudges Restaurant, the former Sun Public House, is listed Grade II, entry 1173908.
A row of low bungalow roofs on the flat land of the Selsey peninsula

Words behind the checks

Thermal element
One of a home's walls, floors or roofs, treated as a single insulating part.
Completion certificate
The council's record that building work complies with the Regulations.
Final certificate
A registered approver's record of the same thing.
Archdeacon's notice
A written notice that covers some like-for-like church roof work.

The plain-as-day roof check

Trees, weight, listed briefs and papers: four checks for Northaw roofs

4 checks about 3 minutes to read

  1. Trees over the roof
  2. A heavier covering on old timbers
  3. Describing a listed roof to the council
  4. Papers worth keeping after a re-cover

01 Trees over the roof

A tree that overhangs a roof drops leaves into gutters, twigs onto tiles and seed into the angles where moss takes hold. Look at the gutter nearest the tree for a green mat or a line of shoots, at the valleys for packed debris, and at the slope beneath the branches for tiles with a permanent shine of damp. A branch that scrapes the covering in wind wears the surface, and a heavy limb that falls can crack tiles and bend a ridge.

Clearing a gutter is a small job, but a roof with a valley full of leaves can leak at the lining. Which? Trusted Traders give £75 to £350 for a gutter clear-out all round the house (survey of 11 traders, November 2025, excluding VAT). Pruning a tree is a different trade and a different consent, if the tree is protected, and the council can say whether it is. A roofer's survey takes in the effect of the tree on the roof and leaves the tree to its owner. A neighbour's tree overhanging the boundary is a matter between neighbours, and photographs of the leaf fall help any conversation about it.

02 A heavier covering on old timbers

Rafters, purlins and wall plates were sized for the covering they first carried, and a different covering can load them differently. Weight is one trigger in the Planning Portal's guide: a new material that "increases the weight of the roof covering by 15 per cent or more" calls for approval, with a structural engineer or surveyor consulted beforehand. Approved Document A treats a roof load "increased by more than 15%" as a significant change.

What counts is the weight of the actual product on the actual roof. Look in the loft for sagging rafters, a bowed ridge and gaps at the wall plate, and look from the road for a roof that dips between the walls. A Northaw roof showing any of these has its structural question answered before the covering is picked, since a new covering on tired timbers solves nothing. Old timbers can be sound; the survey simply looks before anything is laid on them, and what it finds is explained in plain words, including anything that needs a closer look from a structural engineer.

03 Describing a listed roof to the council

Three of the listed buildings in and around Northaw are Grade II*, which means a council officer will want to know the roof as it is before anything changes. Photographs from the ground at each elevation, a note of the covering and any lead, a sketch of the ridge and chimneys, and the age of any earlier repair are all useful. A close shot of a damaged area is better than a general view, and a date on each picture avoids confusion later.

A listed house needs listed building consent for changes that touch its character, so even a matching repair is worth raising with the council. The Parish Church of St Thomas a Becket, a Church of England church in use, goes through the faculty system instead, where renewing a roof covering in matching material can be done on the strength of the archdeacon's written notice. Ask the council which route applies before pictures are sent, and keep its reply. A clear description of the roof, sent early, saves the officer a site visit that was never needed, and it keeps the conversation about what the roof is, rather than what someone guesses it might be.

04 Papers worth keeping after a re-cover

Some paperwork matters after a roof is finished. Where the council's building control team inspects, the council team certifies completion once the work is found to comply with the Building Regulations; a registered building control approver issues a final certificate. Whichever arrives belongs with the deeds, where a buyer's solicitor will look for it. Keep the written quote, any consent or notice from the council, and dated photos taken at each stage of the job.

Note the cancellation window too: 14 days, which begins on the day following signing. The Citizens Advice consumer helpline is 0808 223 1133. If a problem arises, put it to the business in writing first. No cancellation right attaches to an emergency visit the customer requested for urgent repairs, so the 14-day window covers a contract signed at home, not that call-out.

The dashed ring takes in the nearest towns and villages we cover around Northaw. Map tiles © Esri; map data © OpenStreetMap contributors.

Northaw roofs: answers on listing and records

01What does a tree overhanging a Northaw roof do to the covering?

It drops leaves and twigs into gutters and valleys, keeps the slope beneath it damp and gives moss a hold. A branch that rubs in wind wears the tiles. The survey looks at the gutters, the valleys and the slope under the branches, and says plainly what else is wrong on the roof alongside it. A photograph of the worst gutter, sent over WhatsApp, can be seen in advance. The price that follows is one total, and the tree itself stays with its owner and, where protected, with the council, so a roofer neither prunes it nor advises on whether it may be pruned.

02How does the Northaw conservation area bear on a re-cover?

The council behind the Northaw conservation area is Welwyn Hatfield Borough Council, which holds the boundary and is the one to place a house against it. Closer control over outside changes follows from designation. An Article 4 direction can remove further permitted development rights, so we check with the council first. The reply is passed to the owner ahead of any covering decision, since it may restrict what can be proposed. The planning guide explains how the rules fit together.

03Do the Article 4 entries near Northaw affect a house roof?

Entries of that kind lie near the village. For any Northaw address, check with Welwyn Hatfield Borough Council whether an Article 4 direction applies to the house; a direction attaches to a mapped area or site, and the council keeps the maps. A short email with the address is enough to get a reply from the council, and the reply should be in hand before materials are ordered or a covering is agreed, whatever the size or type of the job.

04Which route applies to roof work at the Parish Church of St Thomas a Becket?

The church is listed Grade II* (entry 1348170) and belongs to the Church of England. The 2010 Order keeps the exemption "for church buildings within the faculty jurisdiction of the Church of England", so the faculty system stands in for listed building consent. "The like for like replacement of roof lead or other material covering the roof of a listed building" is on List B, which calls for the archdeacon's written notice. Planning is separate, and the council decides it.

05What does listing mean for The Dower House, Northaw Place and Judges?

The Dower House (entry 1348167) and Northaw Place (entry 1100972) are listed Grade II*, and Judges Restaurant, the former Sun Public House, is listed Grade II (entry 1173908). Work done "in any manner which would affect its character as a building of special architectural or historic interest" needs listed building consent. Swapping the covering, shifting the ridge or adding a rooflight would each go to the council first, with the owner's own dated photographs of the present covering. Each is a separate list entry, and a neighbouring roof sits outside all of them unless it carries an entry of its own.

06Who licenses scaffolding for a Northaw house, and at what price?

Section 169 of the Highways Act 1980 is the licensing law, and the highway authority in Northaw is Hertfordshire County Council. Hertfordshire County Council's licensing page says it costs "£134 for a 14 day licence" and is "£59 for every week after", and "It usually takes 3 weeks to process an application." We arrange the licence with our scaffolder. The footway keeps a clear 1.2 m for walkers, and private land with room for the tower may avoid it altogether. The licensing page also states: "You could be fined up to £5,000 if you don't get a licence." Applicants need insurance of a "minimum of £10 million", and renewals are due "no later than five working days before the expiry".

07Who checks a Northaw re-roof for Building Regulations, and when is weight a factor?

Welwyn Hatfield Borough Council's building control team, or a registered building control approver. The Planning Portal's main page says "In most situations, this work will need Building Regulations approval." A covering "15 per cent or more" heavier needs approval and a structural check first. The council's completion certificate, or an approver's final certificate, is the record that the work complies; file it with the deeds. Ask early which body will inspect, and put its name on the quote, so that nobody is unsure who to call when a question comes up midway through the job.

08Does a re-roof in Northaw mean the insulation has to be upgraded?

It can. Approved Document L paragraph 11.3 treats a renovation of "More than 50% of the surface of the individual thermal element" as one that brings the whole element up to standard, where feasible, and it names "Replacing the waterproof membrane on a flat roof" as renovation. For a retained roof, Table 4.3 gives a threshold of 0.35 and an improved 0.16. Where the full upgrade proves impractical, or misses a "simple payback of 15 years or less", the lowest feasible U-value applies instead, and the survey checks what the existing roof already has.

09Which papers should a Northaw owner keep after a roof job?

The written quote, any consent, notice or approval from the council or the church, the completion or final certificate when building control was involved, and dated photographs before, during and after. The cancellation terms of the contract are worth keeping as well, along with a note of the date of signing. A buyer's solicitor may ask for the certificate years later, so it is kept with the deeds, and a spare copy held digitally costs nothing and prevents a lost original from becoming a problem.

Get a written price for your roof

10-year workmanship guarantee, in writing

Tell us about your roof

Call WhatsApp Written quote