Call 01582 935272

Tiddington · 29 road miles south-west

Roofers in Tiddington

Stripping, re-battening and re-covering a roof in Tiddington, an Oxfordshire village 29.1 road miles from Dunstable, is quoted in the form of one written total.

Get a written quote

Call 01582 935272WhatsApp us

Council
South Oxfordshire District
Road miles
29
Building control
South Oxfordshire

Roofs round St Helen's church and the Fox and Goat

Dunstable and Tiddington are linked by a drive of 29.1 road miles, bearing south-west, that takes about 50 minutes. At the 2021 Census, Tiddington-with-Albury parish had 683 usual residents, a small parish whose listings include the church, a public house and cottages. Three of them are set out next with grades and list entries attached, because a listing governs what may be done to the roof above it.

Great Milton, Waterstock and Ickford each have a conservation area within a few miles of Tiddington, and South Oxfordshire District Council can say for any address in the village itself whether a designation or an Article 4 direction touches it. South Oxfordshire District Council takes planning applications from Tiddington households. Our planning guide collects the roof rules, and the roof replacement page follows a full strip from first tile to ridge.

  1. 01Church of St HelenGrade II, National Heritage List entry 1047466, first listed on 18 July 1963, a Church of England church.
  2. 02The Fox and GoatThe public house, Grade II, entry 1047471, first listed on 21 May 1985, and its roof forms part of the listed whole.
  3. 03The Cottage, beside BrielaGrade II, National Heritage List entry 1047472, in the village, so any roof change is put to the council first.
Brick semis with concrete tile roofs and flat-roofed garages

Re-roofing words used in Tiddington

Batten
The thin timber lath nailed across rafters for tiles to hang on.
Underlay
A waterproof layer under the battens, a second line of defence.
Strip
To take the old covering off a slope, down to the rafters.
Fixing specification
The plan, set per roof, for pinning every tile against wind.

The plain-as-day roof check

What comes off, and what stays, in a Tiddington re-roof

4 checks about 3 minutes to read

  1. Tile nibs, nails and clips
  2. The batten line
  3. Underlay beneath the tiles
  4. Ridge, hips and verges after the strip

01 Tile nibs, nails and clips

Each tile hangs from a batten on two small lugs, the nibs, and is held more firmly by a nail or a clip. On a failing slope the tiles sit at slightly different angles, ride up at the lower edge, or rattle in a gale. A tile that lifts under finger pressure at its lower edge is held by its own weight alone and may be missing a fixing, which is easy to test from a ladder but unwise to try from a roof. A cracked tile can show only as a faint dark line, so a clean photograph in low sun helps.

BS 5534:2014+A2:2018 is the current edition of the slating and tiling code of practice. Marley says that installing to it "isn't required by law", and it adds that a fixing specification is written site by site, and that plan takes account of the exposure of the roof. Because such a plan belongs to one roof, it is fair to ask any firm which standard and which method of fixing its price assumes.

02 The batten line

Battens are the timber strips carrying the tiles, and nobody sees them until the roof is stripped. At that point any batten that is split, rotten or nailed unevenly is replaced. From a loft, a batten that bows between rafters, or shows a dark stain at a nail, is a sign of old water, and a torch at the hatch reveals it without a ladder. A stain on the felt in line with a batten suggests the nail has let moisture along its shank, and a row of such marks is worth reporting even when no drip has reached the ceiling.

The batten line also sets the gauge, the distance between rows, and the gauge fixes how much of each tile the next row overlaps. If the gauge is wrong, rain can be driven under the laps. The survey measures the existing gauge and notes whether it suits the tile that is planned, because a change of tile type can call for a different spacing. Where the new tile is the same as the old one, the existing batten gauge is a good starting point, though each batten still has to be sound before it is reused.

03 Underlay beneath the tiles

Under the battens, draped across the rafters, runs the underlay, a membrane meant to catch whatever water the tiles let by. An older roof might carry a stiff black felt that has cracked, or none at all, and replacing it is a normal part of a strip. From the loft, look for a sheet that sags between rafters in a bag, tears at the edges or lets a thread of light through a split.

A re-roof renews the underlay together with the covering. Marley specifies eaves ventilation of 25 mm at 15° or less and 10 mm above 15° where a high-resistance underlay sits over a cold roof, and that sort of sheet is not vapour-permeable. The ventilation gap is kept clear as the new sheet is dressed into the gutter, and it is checked again before tiling starts. At the ridge, a vent or a ridge gap lets damp air out of the loft, and an existing arrangement can be choked where quilt laid across the loft has been shoved out to the wall plate, which the new work avoids.

04 Ridge, hips and verges after the strip

A stripped roof is the moment to rebuild the ridge, hips and verges with new fixings. BS 8612:2018 is the standard covering dry-fixed ridge, hip and verge parts, and Marley says that since the 2015 amendments to BS 5534 mortar "could no longer be relied upon as the only means of securing the roof covering", so a ridge bedded in mortar also gets a mechanical fixing. Dry-fixed parts clip or screw down, with no wet mortar to crack in frost, though pointing and bedding may remain for appearance on an older house.

The strip also shows what the chimney flashings, the valley linings and the rafters have been doing. Lead sheet is made to BS EN 12588 in codes 3 to 8, and the specification chooses a code for each detail. The pitched roofing page describes how these parts fit together, and a picture of a verge, sent over WhatsApp to 07880 284133, lets us see the edge before the survey. Include a wide shot showing the gable wall below it, so the line of any staining is clear.

The dashed ring takes in the nearest towns and villages we cover around Tiddington. Map tiles © Esri; map data © OpenStreetMap contributors.

Roof questions for Tiddington homes

01What happens, in order, when a Tiddington roof is stripped and re-covered?

The old tiles come off one slope at a time, which exposes the battens and underlay. Rotten battens are replaced, a new underlay is laid, then new battens and the new covering go on, with the ridge, hips and verges fixed to the specification. Flashings at chimneys and walls are renewed as the covering reaches them. The survey comes first and sets the written total, with any extra work the roof has revealed reported in plain words. Scaffold for the Tiddington job sits inside that one total. A roof that has been repaired in the past can show patches of different tile colour, and the survey sees which patches are repairs and which are original covering.

02Is Tiddington itself in a conservation area, and does that change a re-roof?

Great Milton, Waterstock and Ickford have conservation areas within a few miles, so a house near those places may face extra planning control. For an address in Tiddington, ask South Oxfordshire District Council whether any designation applies, or an Article 4 direction, before you pick a covering. An Article 4 direction can remove further permitted development rights, so we check with the council first. For a house roof elsewhere in the district, our planning guide explains how permitted development normally applies.

03Which route covers repairs to the roof of St Helen's church in Tiddington?

St Helen's, at Albury in the same parish, is Grade II (entry 1047466) and belongs to the Church of England. Where the Church of England keeps a church open for worship, the faculty system applies, under the faculty jurisdiction of the Church of England, and it replaces listed building consent. For a repair that renews roof covering in the same material, the archdeacon may authorise it by written notice, so no full faculty is sought. Whether a roof job at St Helen's also needs planning permission is settled by the ordinary planning tests, which means the faculty covers only part of the picture for a church roof in Tiddington.

04Do the Fox and Goat and the cottage beside Briela have special roof requirements?

They do. The Fox and Goat (entry 1047471) and The Cottage adjoining Briela (entry 1047472) are both Grade II. Roof work stays within a listed building's permitted development rights, yet consent under the listed-building system is demanded for works "in any manner which would affect its character as a building of special architectural or historic interest". The council decides on that, and it is asked about the covering and the ridge detail well before a quote is accepted, since an answer can alter the plan.

05Who deals with scaffold licences and building control on a Tiddington roof?

In Tiddington the highway authority is Oxfordshire County Council, and its licence is needed under section 169 of the Highways Act 1980 when scaffolding stands on a pavement or lane. We arrange the licence with our scaffolder. Building control is South Oxfordshire District Council's building control service. A complete re-roof is over the Planning Portal's second limit, which is "Less than 50 per cent of the roof is affected", so Building Regulations approval is needed. No council nearby publishes a stricter test.

06What might replacing every tile on a three-bedroom Tiddington house cost?

Once the survey is over, a quote from us comes as a single written total, which leaves published third-party ranges as the only guide beforehand. Which? Trusted Traders gave £7,000 to £21,000, excluding VAT, for taking off and renewing the whole roof of an average three-bedroom house, in a survey of 11 traders gathered in November 2025. It is a national range. The covering chosen, access, the number of chimneys and the state of the timbers under the old tiles move a real price within it.

07Why is a site-specific fixing specification written for a Tiddington re-roof?

Wind lifts tiles, and how hard it pulls depends on the site. Under BS 5534, Marley explains, the fixings are laid down in a specification made for the site, and it takes account of how exposed the roof is. Following the standard is not a legal requirement, Marley notes, and ridge and hip tiles are pinned mechanically against the uplift that has been calculated for that particular roof. A Tiddington house on open ground and one tucked behind trees can therefore end up with different specifications.

08Is there a government grant towards a new roof in Tiddington?

A new or repaired roof is not covered by any government scheme open in England. Schemes that are open pay for loft insulation and heating, and a household can see on GOV.UK what it might qualify for. Eligibility for the Warm Homes: Local Grant rests on a privately owned home with an EPC rating from D to G, and an income that "must usually be £36,000 a year or less". The Energy Company Obligation "is closing on 31 December 2026", while new installations under the Great British Insulation Scheme stopped on 31 March 2026, and a council may run its own help, so ask it.

09Does a Tiddington re-roof have to meet new insulation standards?

It can. Approved Document L (2021) counts a re-roof as renovation of the roof element. Once more than half of the element is renovated, para 11.3 expects the lot to be improved where that is feasible, and para 4.13 sets the limit at measures that pay back in a simple payback of 15 years or less. Table 4.3 gives a threshold value of 0.35 and an improved value of 0.16 W/m²K for the roof. South Oxfordshire's building control service says what applies at a Tiddington address, and the answer shapes how deep the new insulation can go.

Get a written price for your roof

10-year workmanship guarantee, in writing

Tell us about your roof

Call WhatsApp Written quote