01 Lead at the abutments
Wherever a roof slope runs into a taller wall, a strip of lead carries the water over the join. Stand back and look at these junctions beside a chimney, a gable or a taller part of the house. The lead should lie flat against both surfaces, with no lifted edge, no split along a fold and no gap to the brickwork. Where lead has curled at the top, or a bead of mastic has cracked, water is being let behind it. Check too for a stain on the wall inside next to the junction, because lead that lets go can leak for weeks before a ceiling shows it.
MyJobQuote says correctly installed lead flashing "can last for over 80 years", and that figure comes with a condition: it is correct installation that gets there. Lead that has split needs replacing rather than patching, since the metal's own movement caused the split. The survey looks at which junctions have failed and which are sound, so the quote covers the ones that need work and leaves the rest alone. Lead is dressed to the shape of the wall and the slope, so a good fit takes care at every fold and a rushed one fails early.