Commercial roof duties

CDM 2015 on commercial roof work in Bedfordshire

Roof work on a shop, unit or office counts as construction work, which brings the Construction (Design and Management) Regulations 2015 into play.

7 August 2026 10 minute read

Get a written quote

Call 01582 935272WhatsApp us

Rear flat roofs of a brick shop parade with flats above
PicturedRear flat roofs of a brick shop parade with flats above.
A roof drawing with its parts named: rooflights, roller shutter, gutterRooflightsRoller shutterGutter

Who counts as the client on a commercial roof

CDM 2015 starts from a simple split. HSE defines a domestic client as "any individual who has construction work carried out on their home, or the home of a family member, that is not done as part of any business." A shop, a warehouse, a clinic, an office or a rented unit does not fit that wording. The person or company ordering roof work on business premises is a client in the ordinary sense of the regulations, and the special arrangement for householders does not cover them.

That arrangement sits in regulation 7. Its effect is to pass a householder's client duties to the contractor where one firm does the job, to the principal contractor once a second contractor is involved, and to the principal designer if a written agreement says so. It is a transfer written for homeowners. A business that commissions the work does not get the transfer, so it needs to know its own position before the first quotation is signed.

In practice the question is who ordered the work, and for whom. A landlord who re-covers the roof over several lettings, a tenant who orders repairs to a unit and a company that owns its own warehouse are each ordering construction work. The table sets the two positions beside each other.

Domestic client and business client under CDM 2015
QuestionHouseholderBusiness
Whose roof?Their own homeBusiness premises
Regulation 7 transfer?YesNo
Client duties sit withThe contractorThe client

One contractor or several: the principal contractor

The regulations count contractors. Regulation 7(1)(a) speaks of "the contractor for a project where there is only one contractor", and regulation 7(1)(b) of the principal contractor once a second contractor is involved. A commercial roof job reaches the second case sooner than a house does. A roofing firm, a separate scaffolding firm and an electrician who disconnects and reconnects rooflight controls are three contractors on one roof, even though the owner sees one job.

With several contractors on a project, a principal contractor is appointed, and regulation 12(1) is the part of CDM 2015 that deals with that role. The point for a client is practical. Before work starts, the order form or contract should name the holder of the role, because the person coordinating the others is the person the client speaks to when something changes on the roof.

A single-contractor project is simpler. One firm does the roof, and it carries the contractor's duties. That includes drawing up the plan for the work, which the next section covers. When a roofer is hired for a repair and then asks for a second trade to join, the project can move from one case to the other part-way through, and the paperwork should move with it.

None of this depends on the size of the building. A small flat-roofed unit with three trades on it and a large warehouse with one firm differ in the number of contractors, not in the rule.

You might hear

Principal contractors only appear on big building sites.

Plain as day

Regulation 7(1) turns on whether there is more than one contractor.

The construction phase plan in plain words

A construction phase plan is in place on every project. Regulation 15(5) has the contractor draw up "a construction phase plan" when there is a single contractor, and a principal contractor carries the equivalent duty under regulation 12 when there are several. The plan is the written account of how the work on that roof will be done safely: how people get up, what is done about the edge, what happens to the people below and where materials go.

A client does not need to write the plan, but a client benefits from seeing it. A plan that names the actual roof, the actual access route and the actual hazards on site is a working document. One that could belong to any building is a form that has been filled in. The difference shows when the roof is walked, the tenant's staff are asked to move their cars, or a delivery has nowhere to stand.

  • Does the plan name this building and this roof, not a general site?
  • Does it say how people reach the roof and keep clear of its edges?
  • Does it cover the people below, such as staff, customers and the neighbouring unit?
  • Does it say where the skip and the materials go?

A commercial roof also brings problems a house roof does not. Rooflights in a long sheet roof, plant such as extractor fans on the slope, and a roof edge over a loading bay all go in the plan if the building has them. Ask for the plan before the date is booked, so any gap is a conversation and not a delay.

Whatever the project, the contractor's quote is separate from the plan. The plan describes how the work is run, and the price is a separate matter that waits for the survey.

Fragile sheets and asbestos on commercial buildings

Older commercial roofs raise two questions before any plan is written: is the roof safe to walk on, and does it contain asbestos. HSE's guidance on asbestos cement roofs says "AC roofs are always fragile", which means nobody walks on them without the proper arrangements. A fragile sheet roof can look solid from above, and moss, paint and dirt can disguise it.

On the second question HSE's rule is "If the building was built or refurbished before 2000, assume that there is asbestos in it." It reaches refurbished buildings too, so a unit put up in the 1970s and re-roofed in 1998 is inside it. It does not say every older roof contains asbestos. It tells an owner what to assume until a survey says otherwise.

  • Asbestos cement sheeting taken off whole and handled carefully, so it does not break up, is non-licensed work, and HSE counts sheets weathered with age but not otherwise substantially damaged in that group.
  • Sheeting that fire or flood has substantially damaged or broken up is notifiable non-licensed work.
  • HSE puts most work on asbestos insulating board in the licensed category, and its list of locations includes "AIB white soffit panels to underside of roof eaves".

Waste has its own rule. HSE's guidance is "Use a lockable skip for asbestos", and the household exemption from the consignment note carries the exclusion "other than asbestos waste". MyJobQuote's page of 9 September 2026 gives around £2,750 as the average cost of removing asbestos from a roof in the UK and around £325 for an asbestos survey in 2026. Both are third-party averages.

Our own role is limited to the roof. If a survey finds sheeting that might be asbestos cement, the next step is a specialist assessment, not a guess from the ladder.

VAT, the reverse charge and the Construction Industry Scheme

A business customer can meet a second set of rules on the same job. The VAT domestic reverse charge for building and construction services is tied to the Construction Industry Scheme: it covers supplies of services that are reported within that scheme. Under it the customer, not the contractor, accounts for the VAT on the invoice, and it works between VAT-registered businesses only.

There is an exit for the last customer in the chain. HMRC's technical guidance says the reverse charge "does not apply for supplies to end users", and that holds once the customer has notified the supplier in writing. A company that occupies and uses its own roof, and has given that notice, is outside it for that supply. A property company that lets the building on, or a main contractor that passes the roof work to a sub-contractor, may not be.

The practical step is to settle the position before the invoice, not after it. If the customer is an end user, say so in writing when the order is placed. If the customer is a business within the scheme, the contractor and the customer's accountant agree how the invoice is treated.

  • Is the customer VAT-registered?
  • Is the customer within the Construction Industry Scheme for this supply?
  • Has the customer stated in writing to the contractor that it is the end user?
  • Does the invoice say which treatment applies?

This page is a pointer, not tax advice. How a particular invoice is treated is for the customer's accountant or HMRC to say.

Scaffold licences across Bedfordshire, Luton and Milton Keynes

A commercial roof can need scaffolding that stands on or over the highway, and a Highways Act 1980 scaffold licence has to come from the highway authority, and which authority that is changes with the postcode. We arrange the licence with our scaffolder, and the table gives each council's published position for the places this post covers.

Scaffold licence terms published by each council
CouncilPublished terms
Central BedfordshireLicenses scaffolding on its roads
Luton£205 for up to 28 days, £550 deposit
Bedford Borough£178.25 per month or part month (2026)
Milton Keynes£189 up to one month, excluding VAT

Luton Council's page adds that "for scaffolding the licence is issued to the scaffolding company", that its deposit is refundable once the finished work has been inspected and passed, and that it needs a minimum of 10 working days to process an application. Bedford Borough Council's application form says a licence "will normally only be issued to the Company responsible for actually erecting the scaffolding". Milton Keynes lists a standard scaffolding licence of up to one month at £189 excluding VAT.

A scaffold that stays wholly on private land and does not encroach onto the public highway needs no licence, which can be the position for a unit set back on its own estate road, though whether a given road is public is a question for the highway authority. Where a licence is needed, build the application time into the programme, because the council's processing period is not the contractor's to shorten.

Pricing a commercial roof, and what to send first

A commercial roof is costed once it has been surveyed. The covering, the area, the height, the access, the amount of plant and the number of rooflights all move the figure, and the street shows none of them clearly. One written total comes after the survey, with no separate headline figure ahead of it.

That is why the opening questions matter more than the opening number. For a unit on an industrial estate or a shop on a high street, useful details to have to hand are:

  • The age of the building, and whether it was refurbished before 2000.
  • The type of roof, such as profiled sheets, a flat membrane or a pitched covering.
  • Any leaks, with photographs of the stains inside.
  • The tenancy position and who the client is for CDM purposes.

You can begin with a photograph sent to WhatsApp 07880 284133, and we will look at it. Then comes the survey of the roof, which takes in what can be seen from the roof and from inside, together with anything else seen along the way.

The hub page on commercial roofing sets out the work the firm covers. The commercial roofing regulations page goes further into the rules around a commercial roof, the page on fragile roofs and asbestos cement sheets covers the sheeting questions, and the commercial roofing costs page explains what moves a price.

Questions and answers

01Is a business owner a domestic client under CDM 2015?

No. HSE's definition covers an individual whose own home, or a family member's home, is the site, where the work has no business purpose. A company or a landlord ordering work on business premises falls outside it, so the regulation 7 transfer to the contractor does not apply, and the client duties stay with the client. A landlord or tenant should work out which of them placed the order.

02When does a commercial roof job need a principal contractor?

Regulation 7(1) separates a project with a single contractor from one with several. Once there are several, a principal contractor is appointed. A roof with a roofing firm, a scaffolding firm and an electrician for rooflight wiring is such a project. The contract or order should name the holder of that role before the first day on site, so the client knows who coordinates the others.

03Does every roof project need a construction phase plan?

A construction phase plan is in place on every project. For a single-contractor project, regulation 15(5) has the contractor draw it up; with several contractors the principal contractor carries the equivalent duty. A client can ask to see it before the date is fixed, and it should name the actual building, the way onto the roof, the hazards on that roof and the people working or passing below.

04Do roofing invoices to my company fall under the reverse charge?

Between VAT-registered businesses, the reverse charge applies to supplies that are reported in the Construction Industry Scheme. HMRC says it "does not apply for supplies to end users" once they have notified the supplier in writing. Your accountant or HMRC can tell you which side of that line your company sits on, not the roofer, so settle it before the invoice is raised.

05Who applies for a scaffold licence on a roof in Luton?

Luton Borough Council's page says "for scaffolding the licence is issued to the scaffolding company". Luton Borough Council charges £205 for up to 28 days, with a £550 deposit refundable once the finished work has been inspected and passed, and the council asks for at least 10 working days. We arrange the licence with our scaffolder, and any scaffold sits inside the written quote.