Does removing a chimney breast need a party wall notice?

If the breast sits in a wall that two properties share, the Party Wall etc. Act 1996 applies. The notice comes from whoever is paying for the work, and the Act fixes how far ahead.

Get a written quote

Call 01582 935272WhatsApp us

A high view looking down on a clay tile roof, its ridge, hips and brick chimney
PicturedA high view looking down on a clay tile roof, its ridge, hips and brick chimney.

The short answer

Yes, if the breast sits in a party wall. Cutting out a projecting breast, jamb or flue is party-structure work under the Act, so the building owner has to send notice out two months or more ahead of the work. The neighbour then has 14 days to reply, and a surveyor comes in only on dissent or silence.

A roof drawing with its parts named: pots, flaunching, step flashing, apronPotsFlaunchingStep flashingApron

When a breast becomes party work

The Party Wall etc. Act 1996 covers building work to walls that neighbouring properties share. Section 2(2)(g) gives the right "to cut away from a party wall, party fence wall, external wall or boundary wall any footing or any projecting chimney breast, jamb or flue". Where the breast belongs to a wall that two houses rely on, that wording catches it as soon as the cutting starts, and cutting is what removal involves. The same goes for a jamb or a flue on that wall.

The word that counts is party. A breast in an outer wall owned by your house alone falls outside the Act, whereas one in the wall between a semi-detached pair or a terrace sits in the Act's territory. Ownership of the wall is therefore the first thing to establish. A roof survey will not answer it: the deeds, a conversation with next door and a party wall surveyor can.

The Act talks about a building owner and an adjoining owner. The building owner is whoever is having the work done, which means you. The adjoining owner is the neighbour, and where the neighbouring house is let, the tenant who lives there has a say as well. Our guide to chimney breast removal regulations covers the Building Regulations side, which is a separate question from the party wall one.

Two months, 14 days and consent in writing

Section 3 sets the timing for party structure work. The notice has to "be served at least two months before the date on which the proposed work will begin". That is the longest lead time in the Act, because cutting into a shared wall is a bigger intrusion than building a fresh one beside it, and the neighbour needs time to take advice, arrange access and decide whether to consent or appoint a surveyor.

Party wall notice periods in the Act
WorkNotice
Taking out a chimney breastTwo months minimum (s3)
Fresh wall at the boundaryAt least one month (s1)
Excavating near a neighbour's houseAt least one month (s6)

Once the notice arrives, the neighbour has 14 days. Without consent inside that period, section 5 treats them as "deemed to have dissented from the notice"; GOV.UK adds: "You cannot assume that no response means they agree to the works." Dissent sends the matter into the section 10 surveyor procedure, which is a way of settling the terms, not a veto. The neighbour may also accept an earlier start, but only "with the consent in writing of the adjoining owners and of the adjoining occupiers".

Who does what on the job

Sending the notice is the building owner's task. We do not prepare or send it for you, and a roofing firm is not the place to take party wall questions: they go to a party wall surveyor, never to building control. Surveyors enter the picture when the neighbour dissents or stays silent for 14 days, or when the two sides cannot agree between themselves.

Building control runs alongside as a separate track. Taking out a breast always needs Building Regulations approval, handled by the council or a registered building control approver. The planning position is a third strand, set out in our answer on planning permission to remove a chimney, and you will want all three answers before the date is fixed.

On the roofing side, what we survey is the part above the breast: the stack, the flashings and the roof around them. If stack and breast are both coming out, send a photo to WhatsApp on 07880 284133 and ask about the order of the work on our chimney repairs pages. Begin the notice early, because two months is a long wait with scaffold booked.

Breast removal and party wall notices

01Who serves the party wall notice for a chimney breast?

The building owner, which is the person having the work done. The notice goes to the adjoining owner, and to the occupier where the next-door house is let. We do not send it on your behalf. A party wall surveyor can explain the wording and the dates, and a note of the day you served it is worth keeping with your papers.

02What if my neighbour does not reply to the notice?

Past the 14 days, silence is treated as dissent, and GOV.UK says no response must not be read as agreement. A surveyor is then agreed between you, or one is named by each side, and the dispute procedure runs. It settles how the work is done, and it does not hand the neighbour a veto, so the removal can still go ahead.

03Does a party wall notice replace Building Regulations approval?

No, the two are separate. Building Regulations approval is always required for the breast, because a chimney breast is part of the building's structure, and that approval comes through the council's building control team or a registered building control approver. A party wall notice protects the neighbour's wall, and it does not approve the design of the work, so neither document does the other's job.

04Can the neighbour agree to an earlier start?

Yes, in writing. Section 3 lets work begin sooner with the consent in writing of the adjoining owners and of the adjoining occupiers. A chat over the fence is not enough, so get the agreement signed and dated, and file it beside the notice in case a question arises later when the house is sold, or when the neighbour moves out.