Can a commercial roof be repaired while the business stays open?

Some repairs can go ahead above a working building and others cannot. Access, the space under the work and the roof covering decide which kind of job you have.

Get a written quote

Call 01582 935272WhatsApp us

A large commercial single-ply roof with rooflights and plant
PicturedA large commercial single-ply roof with rooflights and plant.

The short answer

Yes, in some cases a commercial roof can be repaired while the business stays open, but it depends on the work. Access, a safe zone below the repair, the roof covering and whether a fragile or asbestos cement sheet is involved all decide whether trading can carry on underneath.

A roof drawing with its parts named: rooflights, roller shutter, gutterRooflightsRoller shutterGutter

What decides whether trading can carry on

The first question is what sits under the damaged part of the roof. A repair above an empty storage bay raises few problems for a business. The same repair above a packing line, a till point or a row of workstations is a different job, because people and stock sit beneath the work. A roofer looks at the roof and the floor below it together before saying what is possible.

Falling debris, dust and noise come next. Removing a failed sheet, cutting out a patch of old covering or fixing new laps drops small pieces and makes a racket on a metal deck. A repair over a part of the building that can be closed off for a short spell is simpler to plan than one over a main corridor or loading door. Where a part of the floor cannot be closed, the repair may be split into smaller sections of roof so that only one area below is affected at a time.

The roof itself sets limits too. HSE's guidance states that "AC roofs are always fragile", and a rooflight in any covering may not carry a person's weight. A fragile roof needs edge protection, walkways or crawling boards before anyone steps onto it, and that preparation changes how much of the building can stay in use beneath. HSE's asbestos guidance says: "If the building was built or refurbished before 2000, assume that there is asbestos in it." That question comes before any sheet is cut, drilled or lifted.

A leak stopped first, the permanent repair after

A leak into a working building can call for two stages. The first is a temporary stop: a sheet fixed over the damaged area, a sealant bead across a failed lap, a patch over a split. It keeps rain off stock and machinery while the proper repair is planned. The second stage is the permanent repair, which deals with the cause rather than the symptom.

Open sheet laps, loose fixings, a blocked gutter and a failed rooflight are among the causes of a commercial roof leak, and each asks something different of the site.

Leak sources and what the repair asks of the building
SourceRepair involvesEffect below
Open sheet lapsRe-sealing or re-fixing the jointSmall zone under the work
Loose fixingsReplacing screws and capsGrit may fall
Blocked gutterClearing and re-laying outletsLittle, if outside
Failed rooflightNew unit or covering over itWider zone, fragile edge

Weather decides the timing of the permanent stage. A membrane or sealant laid on a wet or frosty surface does not bond well, so a dry spell is part of the plan. Our guide to repairing or replacing a commercial roof covers how a roofer decides when patching is enough and when the covering has run its course.

Planning the work around your premises

Tell the roofer how the building runs: opening hours, delivery times, which areas hold stock that rain would spoil, and where staff or customers walk. Those answers shape the order of work and show which areas need to be cleared or covered. They also show where a scaffold or access platform can stand without blocking a loading door or fire exit.

Under Highways Act 1980 s169, a licence is needed before scaffolding is left standing across a footway or carriageway, and it is granted by the highway authority. We arrange the licence with our scaffolder. A scaffold standing wholly inside your boundary falls outside that rule. CDM 2015 also gives every project a construction phase plan, which sets out how the work is organised and how people on site are kept clear of it.

Send a WhatsApp photo of the damage to 07880 284133, or ring 01582 935272. Once the roof has been surveyed, the price follows on paper as one total for the whole repair. The commercial roofing page lists the work we take on, and our guide to fragile roofs and asbestos cement sheets explains the hazards that shape an access plan.

Repairs above a working building

01Does the building have to close during roof repairs?

Not always. A repair over a storage area or a closed-off section may leave the rest of the building in use. A repair over an occupied floor, a loading bay or a main walkway may need that area cleared while the work goes on. The survey shows which of those applies, because it looks at the roof and the space beneath it together.

02Can a temporary patch hold a commercial leak until a full repair?

A temporary sheet or sealant can keep rain out for a limited time, and it is a stopgap, not a cure. Wind may lift a sheet, and a failed patch lets water run in again at the same spot. If rain is coming into the building, ring 01582 935272 and plan a lasting repair for the cause of the leak.

03What should I do before roof work starts above my stock?

Take dated photos of the damage first, then tell your insurer before stock or debris is cleared. The Financial Ombudsman Service's guidance on storm complaints says its staff "usually look at expert reports and photos", so clear images help your case. Cover or shift stock that water could spoil, keep every escape route open, and keep a list of anything damaged.

04Does the reverse charge change VAT on a commercial roof repair?

It can, depending on who the customer is. The reverse charge is a VAT rule for building services sold between businesses registered within the Construction Industry Scheme. A business that is the end user of the building, not a builder passing the work on, falls outside it once that status has been confirmed to the supplier in writing. Your accountant can confirm which side of the line you sit on.