The short answer
Not for careful removal of asbestos cement roof sheeting. HSE places cement sheets that are lifted off whole, with no breaking up, in non-licensed work. Sheets that are broken up or substantially damaged become notifiable non-licensed work, and insulating board jobs that run beyond short duration are licensed.
Asbestos cement sheets and the non-licensed category
HSE's list of non-licensed work includes "asbestos cement products, (eg roof sheeting and rainwater goods) provided the material is carefully handled/removed without breaking up". Its wording goes on to cover asbestos cement that is "weathered but not otherwise substantially damaged". A corrugated cement roof on a warehouse, a barn or a factory unit, lifted off sheet by sheet, sits in that group.
Non-licensed does not mean unregulated. The work still calls for a risk assessment, suitable training and controls that keep fibres down, because a sheet stays low-risk only while it stays whole. Drilling, cutting, scrubbing or dropping a sheet turns an intact product into a source of dust. That is why careful handling is written into HSE's definition and is not an optional extra.
It also helps to remember what the roof is made of underfoot. HSE's fragile roof guidance states that "AC roofs are always fragile", so a worker needs crawling boards, a platform or netting to stand anywhere on the sheets. Removal and fall protection are planned together, and the lifting method, the sequence of sheets and the route down to the skip are all worked out before the first fixing is undone.
Where a licence or a notification does come in
Condition changes the category. HSE moves cement sheeting into notifiable non-licensed work once the material has been "substantially damaged or broken up (eg as a result of fire or flood damage)". In that case the enforcing authority hears about the job before it starts. Asbestos insulating board follows its own rules, set out in the table.
| Material and state | Category |
|---|---|
| Cement sheet, whole, weathered | Non-licensed |
| Cement sheet, broken up or damaged | Notifiable non-licensed |
| Insulating board, short duration, in refurbishment | Notifiable non-licensed |
| Insulating board, longer than short duration | Licensed |
Soffit panels under roof eaves appear in HSE's list of insulating board locations ("AIB white soffit panels to underside of roof eaves"), so a re-fascia on an older building can bring the board into the job even when the roof sheets are cement. Licensed work is carried out by a contractor that holds a licence from HSE, and the building owner has to bring that contractor in before anyone touches the board. Nobody should open up a soffit on the assumption that it is plain timber. The same applies to boarding found behind a fascia, in a ceiling void or around a boiler flue.
What to settle before a sheet moves
HSE's guidance on finding asbestos states: "If the building was built or refurbished before 2000, assume that there is asbestos in it." On a commercial roof of that age, the sensible first step is to identify what the sheets are made of, and a sample tested by a laboratory is the way to do that. MyJobQuote's 2026 averages are around £325 for a survey and around £2,750 for taking asbestos off a roof, from a page last updated on 9 September 2026.
Waste needs a plan as well. HSE's guidance states: "Use a lockable skip for asbestos", and a standard skip with a sheet laid across the top does not meet that. GOV.UK's consignment-note exemption for household hazardous waste applies to waste "other than asbestos waste", so asbestos falls outside it. A business site has its own waste duties, so ask the waste carrier what paperwork it needs.
To raise a roof that may be asbestos cement, send a photo by WhatsApp to 07880 284133. The roof is surveyed before a written total is quoted. Our guide to fragile roofs and asbestos cement sheets covers the hazards in more depth, and the commercial roofing page lists the work.