What is a warm flat roof?

A warm flat roof moves the insulation from between the joists to above the deck. That change of position removes the ventilated void and shifts the design questions elsewhere.

Get a written quote

Call 01582 935272WhatsApp us

Kitchen-diner lit by a large flat rooflight in the ceiling
PicturedKitchen-diner lit by a large flat rooflight in the ceiling.

The short answer

A warm flat roof has its insulation laid on top of the deck and covered by the waterproof membrane, so the deck and joists stay close to the temperature of the room below. Because the structure sits inside the insulated layer, a warm roof is built without a ventilated void above the ceiling.

A roof drawing with its parts named: lantern, rubber deck, outlet, lead flashingLanternRubber deckOutletLead flashing

Where the insulation sits

Follow a warm roof upward from the room. The ceiling comes first, then the joists, then the deck. A vapour control layer can be laid over the deck, and the insulation boards sit on top of that. The waterproof membrane goes over the insulation as the outermost layer. The name comes from the position of the deck, which is held inside the insulated part of the building. The insulation boards, the vapour control layer and the membrane are separate products, and each one comes with its own fitting instructions from its maker.

That position changes what the structure experiences. Heat from the house reaches the joists and deck first, so they stay near room temperature through winter instead of dropping to the outdoor level. The insulation and the membrane take the cold, and they are materials made to do that. The warm and cold roofs guide puts both layouts next to each other within flat roofing.

A warm roof is built from the deck upward, so it is a natural fit when the roof is being stripped and recovered anyway. With the old covering taken away and the deck repaired where needed, the new layers go on in order from the bottom. The ceiling and joists below are left undisturbed, which keeps work indoors to a minimum. The survey still looks at the ceiling beneath, because a warm roof hides its deck under the insulation once it is finished, and any soft boards have to be found before the layers go down.

Why there is no void to ventilate

A cold roof needs a ventilated gap because its deck is cold and moist indoor air can condense on it. In a warm roof the deck is kept warm, so that condensation risk is moved out of the structure. With no void between insulation and deck, there is no airspace to ventilate, and the ceiling stays a plain ceiling.

The risk is not removed, only relocated. Moisture control in a warm roof relies on the vapour control layer and on how well its joins and edges are sealed. Every pipe, outlet and rooflight kerb that passes through it is a place where the seal has to be remade carefully. BS 5250, the British Standard on moisture in buildings, is listed by BSI as current but under review, and it is the code that moisture design is judged against. A neat seal at one corner means little if the next one is left open.

Two layouts, three questions
QuestionWarm roofCold roof
Where is the insulation?On the deckBetween joists
Is there a void?NoYes, ventilated
How cold is the deck?Near room levelNear outdoor level

What Part L asks of a warm roof

Energy rules come into the job whenever a covering is renewed. Approved Document L, the Building Regulations guidance on saving energy, lists the roof in Table 4.3 with a threshold of 0.35 and an improved figure of 0.16 W/m²K. Stripping and replacing the membrane of a flat roof falls under renovation as the document defines it. Renovation reaching beyond half of the roof area brings the whole roof into scope for upgrade, provided that can be done.

If the improved figure is out of reach, or the saving would not come back within "a simple payback of 15 years or less", the document accepts the lowest U-value the roof can feasibly reach. Insulation above the deck has more room to grow than insulation squeezed between joists, which is why a warm layout is useful when figures must be met on a roof with shallow joists.

The extra thickness raises the finished roof, which can affect door thresholds and window heads, so the survey checks the heights. The flat roof building regulations guide covers the approval route, and the repair or replace guide covers when a roof is renewed. Window heads and thresholds are two places where an added thickness can show up.

Warm roof questions, answered plainly

01Which suits my roof, warm or cold?

It depends on the roof, not on a rule. A warm layout suits a roof being stripped and recovered, where edge heights and thresholds can take the extra thickness. A cold layout keeps the joists doing the insulating work and stays with a ventilated void. The survey measures what is there before either is recommended, and the written price follows from that choice.

02Does a warm roof need ventilation?

It is built without a ventilated void, so there is nothing to ventilate in the way a cold roof needs. Moisture control moves to the vapour control layer and the sealing of its joins and edges. A warm roof still needs sound detailing at upstands and penetrations, because gaps there let moisture past the layer and into the insulation. Asking how the layer is sealed is worthwhile.

03Does the insulation raise the edge of the roof?

Yes, it can. Insulation laid above the deck adds thickness to the finished roof, and upstands, thresholds and window heads have to cope with the extra height. That is why heights are measured at the survey. A roof that was low to begin with may need the edge details reworked as part of the job, and a sketch of the junction helps.

04Does fitting a warm roof need building control?

The Planning Portal says: "In most situations, this work will need Building Regulations approval." The route runs through the council's building control team or a registered building control approver, so check it before work starts. The flat roof building regulations guide explains the energy side, and building control confirms what applies to your roof. Say which layer is being replaced.