What happens to solar panels during a re-roof?

Panels sit on top of the roof covering, so they cannot stay in place while the covering under them is stripped. Read on for what comes off, who reconnects it and what the rules say.

Get a written quote

Call 01582 935272WhatsApp us

A stack of new clay plain tiles on a scaffold board
PicturedA stack of new clay plain tiles on a scaffold board.

The short answer

Solar panels come off the slope that is being re-covered and go back once the new covering is on. Their wiring is disconnected and reconnected by the system's installer or another qualified electrician. Class C of the permitted development rules for roofs excludes solar equipment, so the panels are dealt with separately from the re-roof.

A roof drawing with its parts named: ridge tiles, tiles, battens, underlay, raftersRidge tilesTilesBattensUnderlayRafters

What happens to the panels on the slope

A roof-mounted array is carried on rails or brackets that are fixed to the roof structure, and the fixings can pass through or sit under the tiles or slates. The covering beneath the array cannot be lifted, replaced and relaid while the panels remain on top of it. So the panels on a slope due for a new covering are taken off first, and the rails come off with them.

Only then can the old covering be stripped, the battens and underlay checked, and the new underlay, battens and tiles or slates laid. Once the new covering is on, the fixings are put back through it and the panels are refitted. A slope with no panels on it can be re-covered without touching the array, which depends on how the system is laid out across the roof.

While the panels are off they produce nothing from that part of the system, so there is a gap in generation until they are reconnected. That is a matter of days or weeks, depending on the job, and it is worth asking the installer how the system will be shut down and tested when it goes back on. The roof replacement page covers the whole job, and the guide to what happens during a roof replacement shows where the panel work falls in the sequence.

Who disconnects and reconnects them

Panels produce electricity whenever light reaches them, so the wiring between the array, the isolators and the inverter can be live in daylight. Taking panels off and putting them back is therefore work for whoever installed or maintains the system, or for another qualified electrician, rather than a job to leave to anyone with a ladder.

That points to a simple order of events. Contact the installer first, explain that the roof is being replaced, and agree who will shut the system down, remove the panels and later refit and test them. Keep any paperwork the installer gave you for the system, because it tells whoever works on the roof what is up there.

  • The installer's name and contact details, from the system paperwork or the inverter label.
  • The make and number of panels, and how they are arranged across the slopes.
  • Where the isolators and the inverter are.
  • The date the system was fitted.

Whether a firm other than the original installer may handle the system is a question for the installer and your electrician, and the terms of any cover on the equipment are theirs to explain. The roofer's side of the job is the roof itself, which we look at before quoting. A few photographs of the array sent to 07880 284133 on WhatsApp give a first idea of the layout.

Rules, planning and the price

Re-roofing a house is normally permitted development under Class C. The same class excludes "the installation, alteration or replacement of solar photovoltaics or solar thermal equipment" from what it permits, so the panels are not covered by the permission that covers the new tiles. The guide to planning permission for roof work sets out what Class C covers, and an Article 4 direction, listed status or a flat can change the answer. Before work starts we check the planning or building-control route with the council.

A full re-roof takes the work past the Planning Portal's "Less than 50 per cent of the roof is affected" test, so Building Regulations approval is needed whatever the covering. The route is the council's building control team or a registered building control approver.

Cost follows how large the roof is, which covering is chosen and how the slopes are reached, plus the panel work, which comes from the installer or electrician and not from the roofer. The written quote for the roof is one total price after the survey. If scaffold has to stand over the pavement, the highway authority's licensing applies, so we arrange the licence with our scaffolder, and the new roof costs guide covers what moves the figure.

Panels and a new roof, answered plainly

01Can part of the roof be re-covered with the panels left on?

Only the slopes without panels. The covering under an array cannot be stripped and relaid while the panels stay on top, so any slope that carries panels has them taken off for the work. Whether a partial job makes sense depends on where the array sits, how worn the rest of the covering is and what the survey shows, and the written price follows the survey.

02Who should I contact before the roof work starts?

The company that installed the system, or an electrician you trust, so that someone qualified shuts the system down, removes the panels and later refits and tests them. Tell them the roof is being replaced and ask what they need to see. If you cannot trace the installer, photograph the inverter and the isolators and keep the pictures with the roof quote.

03Does the system lose electricity while the panels are off?

The panels on the slope being re-covered produce nothing while they are off the roof, so generation from them stops until the system is reconnected. That is the reason to plan the panel removal and refit close to the roofing, and to ask the installer how long the system is likely to be out of use. Their side of the job is theirs to schedule.

04Is a re-roof a good time to check the roof under the panels?

It is the one point when the covering and timbers beneath an array can be seen. If the tiles under the panels are worn, refitting panels onto them can mean taking the panels off again later for another repair. Ask for what is found on the slope to be described plainly before the panels go back. A photo sent on WhatsApp helps to show it.