Can you live in the house while the roof is replaced?

Staying put through a re-roof is possible, and some households arrange to be elsewhere for a few days. The right choice turns on the work itself, the weather cover and who lives in the house.

Get a written quote

Call 01582 935272WhatsApp us

Roofers working along a row of brick Victorian terrace roofs
PicturedRoofers working along a row of brick Victorian terrace roofs.

The short answer

Staying in the house during a roof replacement can work, but whether it suits you depends on the scope of the work, how the open roof is protected from the weather and how the site is reached. Noise, dust and rooms directly under the roof are the points to weigh, together with anyone in the household who needs quiet.

A roof drawing with its parts named: ridge tiles, tiles, battens, underlay, raftersRidge tilesTilesBattensUnderlayRafters

What decides whether you can stay

A roof replacement happens over your head. The old tiles or slates are lifted off, the timbers beneath are looked over, fresh underlay is rolled out, new battens are fixed and the new covering follows, all while the rooms below are in use or empty by your choice. Nothing about the job forces anyone out of the house, and nothing guarantees it will be comfortable to stay. The answer is made up of a few separate points.

  • The scope of the work: a few slopes, a whole roof, a roof with a chimney or dormer to deal with.
  • How a stripped slope is protected from rain while it waits for its new covering, which decides how much weather reaches the loft.
  • Where the rooms sit: bedrooms in the roof space are closer to the work than a ground-floor kitchen.
  • Access: scaffold on the front or back, the skip position, and where the path to the door runs.
  • The people in the house: babies, shift workers, anyone who works from home, anyone who needs quiet or has a health condition.

None of these is fixed in advance, which is why a firm's answer to this question should come after the roof has been looked at. The guide to what happens during a roof replacement sets out the stages so you can picture each one from inside the house.

Safety, noise and what the rules say

Stripping a roof is loud. Old tiles are lifted and passed down, battens are pulled and nailed, and tiles are cut, so the ceiling above you carries the sound. Dust and grit can drop into a loft that is not boarded or sealed. Those are reasons to move valuables, cover loft contents and plan the loudest days around calls or sleep.

Safety has a legal side. Under CDM 2015, a homeowner's client duties pass to the contractor (or the principal contractor when there is more than one), and every project has a construction phase plan. That plan is the place where a family living below the site is meant to be considered, and you are entitled to ask who holds it.

Asbestos is the one finding that can change the arrangements. HSE says: "If the building was built or refurbished before 2000, assume that there is asbestos in it." HSE advises assuming asbestos is present in any building built or refurbished before 2000; cement sheets removed whole without breaking up are non-licensed work, while most work on asbestos insulating board, which HSE lists among soffit materials, is licensed. If something suspect turns up, the safe course is to stop and sort out the arrangements before anyone carries on, and that is a decision for the survey, not for this page.

Getting the house ready for the work

Preparation is mostly practical, and it is advice for you rather than a service. Clear the loft of anything that matters and take pictures off the walls of top-floor rooms, since the vibration travels. Cover furniture that has to stay. Move cars off the drive and away from the scaffold, and keep the youngest children and any pets well away from the working side of the house, the skip and the route from the gate to the door.

Think about the days as well. If you work from home, or someone sleeps by day, plan a different room or a different place for the noisiest stage. If the house has a loft conversion or a bedroom in the roof space, that room is the closest to the work, so you may decide to leave it empty. Ask the firm for the order of work so the loud days are not a surprise.

On the money side, the written quote is one total price after the survey, and what you spend on staying elsewhere is your own decision. Scaffolding on the pavement or road needs a scaffold licence from the highway authority; we arrange the licence with our scaffolder. The page on how long a roof replacement takes covers what moves the length of the job. The roof replacement page describes the full service.

Living through a re-roof, answered plainly

01Can I work from home while the roof is being replaced?

It is possible, but the noise is the issue, because the sound of stripping and nailing carries through the ceiling. Work in a ground-floor room away from the roof if you can, and expect the loudest stage to be the day the old covering comes off. Ask what the order of work is before you agree dates, and keep calls for a quieter place or a quieter time.

02Is it safe to stay with young children in the house?

That depends on the layout and on how the site is kept. Scaffold, a skip and falling debris sit outside the door, and the working side of the house needs to stay out of bounds. Some families prefer to be away for the noisiest stage, and others stay with simple rules. Ask how the site will be separated from the entrance, and make your own call from the answer.

03Do I have to leave if there is a loft conversion?

No rule says so. A room in the roof space is simply the closest to the work, so it picks up the most noise, dust and vibration and is the one to empty or stay out of. Take down anything fragile and keep sleeping arrangements away from it. A survey shows how the conversion is built under the covering, which affects how the work is planned.

04Can I send photos of the rooms below the roof first?

Yes. Pictures of the ceilings, the loft hatch and the view of the slopes from outside, sent to 07880 284133 on WhatsApp, give a first view of the layout, and they help when you decide where to sleep. They cannot replace the survey, which is what the written quote and any advice on staying in the house rest on, so the survey comes first.