Call 01582 935272

Lead roofing

Does the leadwork get replaced on a re-roof?

Not automatically. Lead is looked at when the covering comes off, and what is sound can be kept while worn or split sections are renewed.

Get a written quote

Call 01582 935272WhatsApp us

Roofers working along a row of brick Victorian terrace roofs
PicturedRoofers working along a row of brick Victorian terrace roofs.

The short answer

Not always. Leadwork on a re-roof is judged on the survey: lead that is sound can stay, and lead that is split, worn or in the way of the new covering is renewed. Each decision is made lead by lead, not for the roof as a whole.

A roof drawing with its parts named: lead valley, tiles, hipLead valleyTilesHip

Why a re-roof raises the question

Lead on a roof does not sit apart from the tiles or slates. A flashing at a chimney or a wall tucks beneath the covering at one edge and lies over it at the other. A valley lining runs under the courses on both sides, and the lead at a bay or a porch is laid close to the covering around it. When a roof is stripped, all of that lead is exposed, and some of it has to be lifted out of the way before the new covering can go on.

That is the moment the question comes up. A re-roof affects far more of the roof than a repair does, and under the Planning Portal's guide, work that goes past its limits needs Building Regulations approval. With the covering off, every piece of lead can be seen from both sides, which is a chance to judge it properly, including the parts that were buried under the old courses and could not be reached before. Lead that was hidden under the old courses may be in a better or a worse state than the visible edges suggested.

Put it to any firm quoting for a re-roof, and raise it before the covering comes off. The lead roofing page lists the details that carry lead, and the answer for each one is reached at the roof.

How the keep or renew call is made

Nothing about lead has to be renewed simply because the covering is. MyJobQuote says correctly installed lead flashing can last for over 80 years, so a flashing laid well can outlast a covering. What decides it is the state of the metal and how it will meet the new work.

  • The state of the lead: splits, thin patches, cracks at folds and corners point to renewal.
  • Whether it can be lifted and put back without damage, since old lead that has hardened with age may tear when it is moved.
  • How it will sit with the new covering, because a covering of a different thickness or profile can change how a flashing has to be dressed.
  • The condition of the wedges, the pointing in the raggle and the boards under it.
  • The specification, which sets the code for any new lead.

Rolled lead sheet is made to BS EN 12588 in codes 3 to 8, and the manufacturers Calder and Ecobat both give code 4 as 1.80 mm. No rule of thumb picks the code for a detail: the job's specification names it, detail by detail. The code of lead for flashing page goes into it.

Putting it in the quote and on the roof

Leadwork is part of the roof, so it is part of the price for the roof. Our quote is a single written price, given when the roof has been surveyed, with the lead that stays and the lead that is renewed settled inside it, and scaffold sits within that sum where the job needs it. If you are comparing another firm's quote, ask whether it names the lead to be renewed and what it says about the rest.

Scaffold on public ground is licensed, and we arrange the licence with our scaffolder. That licence is dealt with before the first board goes up, so it does not hold up the strip.

On the roof, the sequence is simple. The covering comes off, the lead is checked and the call is made detail by detail, with the chimney, the wall junctions and any valleys looked at one at a time. A photo of a chimney flashing or a wall junction sent on WhatsApp to 07880 284133 gives a first look before any survey. The repair or replace lead flashing guide shows how a single flashing is judged, which is the same test applied during a re-roof.

Lead on a re-roof, your questions

01Can the old lead be reused on the new covering?

Sometimes it can. Lead that is sound, still flexible and free of splits can be lifted, laid back in position and dressed to the new courses. Old lead that has stiffened, cracked at the folds or worn thin is better replaced, because lifting it may split it and a repair on a re-roof is hard to reach again afterwards. The decision is made piece by piece.

02Is new lead needed even if the old looks fine?

Not on appearance alone. Weathered lead is meant to turn a dull grey, and that is not a fault. What matters is whether the metal is intact, whether the fixings and pointing are holding and whether it will meet the new covering properly. A flashing that passes those checks can stay, while one that does not is renewed whatever the colour.

03Does renewing the lead change its code?

It can. The specification gives every detail a code, so a replacement may come out thicker or thinner than what was there before. Thickness is the part that is fixed by the code: code 3 is 1.32 mm, code 4 is 1.80 mm and code 5 is 2.24 mm. The weights differ a little between makers, so a weight figure means little without the maker named beside it.

04What should I ask about lead when comparing re-roof quotes?

Ask which lead details are being renewed and which kept, and what specification the new lead follows. A quote that says only "re-roof" leaves the question open, and it can come back as an extra afterwards. Put the same questions to each firm so the quotes can be read side by side. Photographs of the chimney and wall junctions help every firm give a clearer answer.

Get a written price for your roof

10-year workmanship guarantee, in writing

Tell us about your roof

Call WhatsApp Written quote